1 / 16

The LHCb Outer Tracker Front End, what does it look like and what is the status

The LHCb Outer Tracker Front End, what does it look like and what is the status. A Collaboration of: Nikhef Heidelberg Krakow Warsaw Beijing. Talk for the LHCb Electronics Working Group 5-2-2003/TS. What part is on the Detector. TDC L0 Buffer. L1 Buffer. DAQ. ASD. ~100m. 50 fC. bias.

cady
Download Presentation

The LHCb Outer Tracker Front End, what does it look like and what is the status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The LHCb Outer Tracker Front End,what does it look like and what is the status A Collaboration of: NikhefHeidelbergKrakowWarsawBeijing Talk for the LHCb Electronics Working Group 5-2-2003/TS

  2. What part is on the Detector TDC L0 Buffer L1 Buffer DAQ ASD ~100m 50 fC bias L0 BX L1 chamber counting room GOL The Front End on the detector HV LV TFC ECS Cooling Electronics Service Box

  3. Inside of a straw module prototype Straws without alu outside Alu shielding Gas volume Feedtrough Board

  4. Feed-trough board grounding and shielding Chamber Feed-trough board (gas tight by gluing) Faraday cage Shielding alu foil inside chamber box wire Alu straw wall for crosstalk shielding And transmission of fast signals Aluminum connection developments Aluminum soldering after copper plating not reliablecan be pulled of.

  5. Grounding and shielding of the critical detector sensor part • Alu straw wall for crosstalk shielding And transmission of fast signals • Soldering of all alu parts to end PCB Alu coating shield Kapton foil for gas tightness Conductive Kapton (for aging protection) Gas GLUE (isolating) Alu coating shield ALU Kapton foil for gas tightness Carbon / epoxy plates Air filled material

  6. Tight packing of 4 module layers in 1 station demands packed electronics and cooling Module Module Module Gas HV TFC Water LV ECS DATA-out 4 cm 25 cm Module

  7. Mechanical model of detector electronics without shielding box

  8. Dissipation and cooling - Airco hall can cool only 80 kW in total, so no dumping in hall ! -our Detector electronics Heat production = 10-15KW - if using air cooling should be closed circuit with water coolerBut air gives dust on HV boards -Water cooling ok for HV board leakage currents, if above dewpoint (13 degr garanteed?)

  9. The Detector Electronics box cooling plates and blocks Outside box cooling bar plates of shielding box module support bar Feed-through board

  10. The Boards inside the box X 1 GOL/Aux Board • Front-end cards: • have to fit inside a closed metal shielding box: 22 x 30 x 4 cm • excellent ground connection to straw-tubes and module reference ground • power dissipation of cards is about 25 W / box → water cooling • easy access should be maintained TDC boards X 2 ASD boards HV boards X 4 X 8

  11. HV boards eventual. used as fuse R=1.1MΩ C=300pF Capacitors: JOHANSON 302R29W331KV4E Max. Volt.: 4kV Size: 5x4x2 mm3 32 channels per board Capacitors embedded in PCB:Company xyz in GB

  12. Results HV Board tests We want much less then 50 on 50000 channels broken, less then 0.1% With 32 caps in a board we have to throw away too much. Must be reliable over the years. Thorough testing and thermal cycling needed HV caps Johanson come tested to 4KV Typical need 1500V RESULTS UPTO NOW: -14 days tested at 2.5 KV: 1 “shorted capacitor 100k ohm” then high current burnout, then sawn open, noting to see After this 14 days cycling from 25 to 65 degr C 1 open connection, broken by stress? Still to be investigated. Further investigation needed Second revision will be made

  13. ASDBLR boards Older prototype (98) with asdblr, HV caps, and regulators on backside, No tdc yet ASDBLR chip: ATLAS DMILL version

  14. OTIS card • TDC board: • radiation hard OTIS TDC chip • provides bias voltage for ASD • power rooting for ASDBLR card • test pulses for ASDBLR

  15. GOL/AUX CARD the interface to the outside world

  16. Conclusion • Design: what we want seems clear. (in collaboration) • Pre-designs have done well in beam-tests in 1998-2000 • Detector Electronics still to be finalized • Cooling construction, prototype boards, pre-production boards • Some parts already in Mass Production Ordering • ASDBLR (with ATLAS) • RAD hard regulators • TTC components TTCrx • GOL

More Related