100 likes | 322 Views
NASA TECHNICAL STANDARDS WORKING GROUP STATUS OF STANDARDS PROGRAM AND ACTIVITIES. Larry L. Schultz Spaceport Engineering & Technology October 16, 2003. Status of Actions. Reviewed 27 proposed standards projects from the MSFC program office for the Center
E N D
NASA TECHNICAL STANDARDSWORKING GROUPSTATUS OF STANDARDSPROGRAM AND ACTIVITIES Larry L. Schultz Spaceport Engineering & Technology October 16, 2003
Status of Actions • Reviewed 27 proposed standards projects from the MSFC program office for the Center • NASA STD-6004 “Stress Corrosion Cracking” review • Provided approval letter in June 2003 • NASA STD-7002A “Payload Test Requirements” review • Provided Draft 1 approval letter in March 2003, Draft 2 in June 2003 • Effectiveness Assessment Action No. 79 • Response provided in August and September 2003 • NASA-STD-5012 “Strength & Life Assessment of Engines” • Provided approval letter in September 2003 • NASA-HDBK-5010, "Fracture Control Implementation Handbook For Payloads, Experiments, and Similar Hardware" • Provided approval letter in September 2003
NASA Standards in Development • Coating Standard – Project Leader – Lou MacDowell • Qualified Suppliers list needs updating • GSE Design Standard – Project Leader – Larry Schultz • OSP requested an updated standard • Draft revision given to OSP for review prior to official update • GSE Welding Standard – Project Leader - Scott Murray • Standard will be up for revalidation in 2004 • Draft revision sent to the program office • Vibro-acoustic handbook – Project Leader Ravi Margasahayam • Comments incorporated by contractor personnel • Updated draft sent to MSFC in June 6, 2003 • Updated draft under review by the Agency • AP2 Handbook – Project Leader Chris Brown, AP2 Program Office • Project Leader to incorporate portions of the handbook into a new AP2 NPG • Completion will be delayed until after the NPG is complete
VCS Standards in Development • ISO standards published • ISO 14625, GSE • ISO 14951, Parts 1 thru 13 - Fluid characteristics • ISO 15389, Flight to ground umbilical • ISO 14302, Space systems -- EMC • ISO 17399, Space systems -- Man Systems Integration • ISO standards in Draft International stage • ISO 14952, Parts 1 thru 6 – Surface Cleanliness of fluid systems • ISO 15859, Space systems -- Fluid Characteristics, sampling and test methods, 13 Parts • ISO 16458, Unmanned Spacecraft Transportation • ISO standards in working or committee draft stage • ISO 14624-5, -6, -7, Space systems – Material Flammability • ISO 22538-1 thru –4, Space systems - Oxygen safety • Amendment to ISO 15389 Flight to ground umbilicals
VCS Standards in Development • ISO CD 14620-3, Safety Requirements - Flight Safety Systems • ISO WD 23041, Unmanned SC Operational Procedures • ISO CD 16455-1 & -2, Stress Corrosion Cracking • ISO 15860, Gas Contamination, Field Measuring Methods • ISO 22108, Non Flight Items - Identification & Control • AWS D17.1, Aerospace welding • ANSI/NCSL Z540.1, General Requirements for Competence of Calibration Laboratories • NFPA 2001 - Standard on Clean Agent Fire Extinguishing Systems • AP-42, Compilation of Air Pollutant Emission Factors, Fifth Edition, Volume I: Stationary Point and Area Sources • United Nations Environment Program Halon Technical Options Committee (UNEP HTOC) Under directions from the Parties to the Montreal Protocol (MP), the HTOC developed and released the Halons Technical Options Committee - 2002 Assessment Report.
VCS Standards in Development • ANSI/ASAE EP411.4, Guidelines for Measuring and Reporting Environmental Parameters for Plant Experiments in Growth Chambers • ASTM D 2512-95, Compatibility of Materials With Liquid Oxygen (Impact Sensitivity Threshold and Pass) • AIAA XXXX, Architecture of Small, Self-Propelled, Autonomous Robots • ISO New Work Items • Update of ISO 14625 – GSE • Orbital Debris • Aerospace Welding
SDO and VCS Development Participation • Personnel participation • 13 KSC personnel participating in SDOs • Standard Development Organizations – 12 • ISO • ASTM • SAE • ASME • AIAA • NCSL • NACE • AWS • NFPA • ASM • ASAE • ASH
Program Awareness/Issues/Initiatives • Hosted a NASA Technical Standards Program Awareness session at KSC – Attendance 50 personnel
Center Review Processes • Standard Proposal Review • Each proposed standard is reviewed by the Center Technical Standards POC for Center expertise. • If expertise is at the Center, the proposal is assigned to a Center subject matter expert for review and comment using the Technical Standards webpage forwarding capability. • Draft Standard Review • Each draft standard is reviewed by the Center standards POC for Center expertise. • If expertise is at the Center, the draft standard is assigned to a Center organization or expert for review and comment using the KAITS system. • A Center concurrence or approval letter with or without comments is prepared and signed by the KSC SMO.
Program Resources • Technical Standards Program participation – 297-10-89-00-00-XX • FY 03 – 1889.5 LH, 0.90 FTE • FY 03 – 24 KSC C.S. personnel participating in the program • FY 03 -- CS labor cost - $ 81,012.64.00 • FY 04 – POP input 1 FTE for UPN 297-10 • Program funding • FY 03 Travel Budget $55K • FY 03 NOA $60K • FY 03 Obligations $ 96.3K • FY 03 4th Quarter Cum Cost $ 68,252 • FY 04 Travel Budget $55K • FY 04 NOA $60K