1 / 26

US 101 Corridor Mobility Master Plan

US 101 Corridor Mobility Master Plan. Agenda Item B-1 San Luis Obispo Council of Governments Board Meeting. August 6, 2014 – B-1. August 6, 2014 – B-1. Purpose of this presentation. Review the scope of work Public Outreach input What’s in the B/C ratio?

caine
Download Presentation

US 101 Corridor Mobility Master Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. US 101 Corridor Mobility Master Plan Agenda Item B-1San Luis Obispo Council of Governments Board Meeting August 6, 2014 – B-1

  2. August 6, 2014 – B-1 Purpose of this presentation • Review the scope of work • Public Outreach input • What’s in the B/C ratio? • Review the project packages – get input • What comes next

  3. Us 101 study scope of work August 6, 2014 – B-1

  4. Public engagement August 6, 2014 – B-1

  5. Projects suggested though outreach that are not included in Technical Analysis August 6, 2014 – B-1

  6. SMART MOBILITY FRAMEWORK August 6, 2014 – B-1

  7. SMART MOBILITY FRAMEWORK August 6, 2014 – B-1

  8. Performance evaluation August 6, 2014 – B-1

  9. Measure of Effectiveness June 4, 2014 – A-2

  10. Project Benefits June 4, 2014 – A-2

  11. Project Costing June 4, 2014 – A-2 • Construction • Capital support • Right of Way

  12. Benefit/Cost Ratio June 4, 2014 – A-2 Ancillary Benefits Consistent with SLOCOG/Caltrans policy Environmental/Institutional Sensitivity Community Support Social Equity

  13. Projects selected for All Segments August 6, 2014 – B-1 Pedestrian and bicycle improvements will be included as part of all interchange projects listed on next slides.

  14. Focus Study Segment 1 August 6, 2014 – B-1

  15. Focus segment 2 August 6, 2014 – B-1

  16. Focus Study Segment 3 August 6, 2014 – B-1

  17. Focus Study Segment 4 August 6, 2014 – B-1

  18. Operational improvements included in technical analysis – Segment 1

  19. Operational improvements included in technical analysis – Segment 2

  20. Operational improvements included in technical analysis – Segments 3 & 4

  21. Next step: Travel Time Reliability August 6, 2014 – B-1

  22. Travel Time Reliability August 6, 2014 – A-2

  23. RTP Integration August 6, 2014 – A-2

  24. Recommendations: Review and comment on improvement packages Schedule draft report in September Final report at October 1st SLOCOG Board meeting June 4, 2014 – A-2 TTAC: Support CTAC: Support

  25. PhaSe I performance measurement August 6, 2014 – A-2

More Related