30 likes | 145 Views
RIAL Workshop on Successful Labor Inspection Models El Salvador XV IACML OAS Washington, D.C. 19 May 2009. Measures adopted to increase the effectiveness, impact, and coverage of labor inspection. Chapter 16 (“Labor”) of DR-CAFTA Strengthened budget and staff
E N D
RIAL Workshop on Successful Labor Inspection Models El Salvador XV IACML OAS Washington, D.C. 19 May 2009
Measures adopted to increase the effectiveness, impact, and coverage of labor inspection • Chapter 16 (“Labor”) of DR-CAFTA • Strengthened budget and staff • Strengthened capacity to conduct inspections • Professionalization of the labor inspection service • Amended laws • Establishment of entry requirements