WG4: Diagnostic/Control/Overall Protection. Outcome of the meeting in Frascati October 2009: The two most urgent points for group WG4:

caitir
Download Presentation

WG4: Diagnostic/Control/Overall Protection

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WG4: Diagnostic/Control/Overall Protection • Outcome of the meeting in Frascati October 2009: • The two most urgent points for group WG4: • to define the diagnosticability of LH possible ports 9, 11 and 14, from the point of view of the visible/IR camera and bolometry, in order to give a hint  on which one is more convenient. • the integration of the reflectometer waveguides with the antenna in the port plug-in.

  2. Port allocation 11 or 14 for LH? Horizontal port 14: • Located between two ICRH antennas (13 and 15). Likely to cause strong modifications in edge density (poloidally inhomogeneus), which may cause strong changes in coupling and hot spots. • To be avoided at all costs. Horizontal port 11: Seems to be optimum for transmission lines and generator placement. May still be magnetically connected to ICRH antenna in 13, since only 40 toroidally apart. Poor coverage by IR/VIS system.

  3. IR/VIS viewsfrom port plug EQ#09 D. Guilhem, Y. Corre, A. Geraud et al. ; « ITER Wide-Angle Viewing Thermographic and Visible System », EFDA_D_2D4ZQC (2007) EQ#09 RIGHT EQ#09 LEFT PP08 PP10 PP07 PP11 PP06 PP12 PP15 PP03 LH antenna in EQ#11 Marginal view of port plug #11 from the endoscope in #09  Risk of vignetting, i.e. “reduction of the brightness or saturation at the periphery”.

  4. TB NB NB NB LH RH IC EC IC TB -- RH TB RH Portplugsviewed by the horizontal IR/VIS system To the right: To the left: EQ#1 views: (3), 4, 5, 6, (7) (17), 16, 15, 14, (13) EQ#3 views: (5), 6, 7, 8, (9)(1), 18, 17, 16, (15) EQ#9 views: (11), 12, 13, 14, (15)(7), 6, 5, 4, (3) EQ#12 views: (14), 15, 16, 17, (18)(10), 9, 8, 7, (6) Port #11 is poorly covered by the horizontal IR/VIS system.

  5. Port allocation 9 for LH? Horizontal port 9: At present, an IR/VIS system is foreseen for 9. If one assumes that one moves the IR/VIS from 9 to 10, and put LH in 9, on can get a more optimum solution: Far away from ICRH antennas, 80 toroidally apart. The LH launcher, if located in port 9, would be well visible by the IR/VIS system in #12.  Generator and transmission line placement?

  6. IR/VIS views from port plug EQ#12 #12 LEFT #12 RIGHT PP14 PP10 PP15 PP09 PP18 PP06 The LH launcher, if in port 9, would be viewed by the IR/VIS system in #12.

  7. Port plugs viewed by the horizontal IR/VIS system, if the IR/VIS system in 9 moves to 10 LH TB NB NB NB RH IC EC IC TB -- RH TB RH To the right: To the left: EQ#1 views: (3), 4, 5, 6, (7) (17), 16, 15, 14, (13) EQ#3 views: (5), 6, 7, 8, (9)(1), 18, 17, 16, (15) EQ#10 views: (12), 13, 14, 15, (16)(8),7, 6, 5, (4) EQ#12 views: (14), 15, 16, 17, (18)(10), 9, 8, 7, (6) Moving IR/VIS from 9 to 10 does not change the overall viewing capability of the outer wall.