DC Smith Greenhouse Heat Shield. Problem Statement. In the DC Smith Greenhouse, heat is being lost due to natural convection through the gaps between the curtain and the wall on the north and south sides of the greenhouse at night . Product Requirements. Design must resist corrosion
E N D
Problem Statement • In the DC Smith Greenhouse, heat is being lost due to natural convection through the gaps between the curtain and the wall on the north and south sides of the greenhouse at night.
Product Requirements • Design must resist corrosion • Design must not inhibit existing system/replacement • Design must cost <$300 Client Information • Johanna Oosterwyk • DC Smith Greenhouse at 465 Babcock Drive
Shower Curtain • Pros • Effective design • Stows away • Cons • Complicated design • Costly • Final Verdict • Eliminated via decision matrix
Solid Pocket System • Pros • Solid barrier • Simple design • Durable • Cons • Expensive • Difficult fabrication and installation • Final Verdict • Eliminated via decision matrix
Foam Board Idea • Pros • Cheap • Easy to work with • Simple Design • Good Insulation properties • Cons • Fragile • Not aesthetic • Final Verdict • Outvoted in final decision
Fabric Pocket Design 24.6’ 9” ~ 2’ or less
Rationale • Cheap and Efficient Design • Aesthetically pleasing • Good insulating properties • Simple fabrication and installation • Corrosion resistant metal • Does not inhibit function and maintenance of existing system
Spatial Parameters 24.6’ 9” ~ 2’ or less
Team Responsibilities • Schedule • Organize and schedule project deadlines • Overall group management • Help with Design Review PowerPoint • Poster • Create display for poster presentation • Help with Design Review PowerPoint • Materials • Create and assess a detailed design • Research and determine materials for fabrication • Determine budget distribution
Team Responsibilities • Report • Write final report document • PowerPoint • Create a visual of design process for final presentation • Fabrication • Build a prototype • Test effectiveness of design • Construct and install final product
Team Members • Schedule • Steve Bye • Olivia Dunigan • Ben Gibbs • Isaac Cohen • Tiler Hall • Zach York • Poster • Jack Meuwissen • Brad Porter • Ryan Kutzora • Geoff Gilles • Material • Luke Surma • Tommy Gibson • Michelle Chiang • Emily Dinen • Willie Rohrer • Matt Koeppel • Report, PowerPoint & Fabrication • TBD