DIFFUSER CM29

Optical sensors. Actuators (4). DIFFUSER CM29. Irises. About 75 – 80 percent complete Materials in hand All Tufnol cassettes made 2 sets brass petals (3mm & 6mm) made 6mm brass cassette assembled & tested by hand Drum being machined

Download Presentation

DIFFUSER CM29

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Optical sensors Actuators (4) DIFFUSER CM29 Irises

  2. About 75 – 80 percent complete • Materials in hand • All Tufnol cassettes made • 2 sets brass petals (3mm & 6mm) made • 6mm brass cassette assembled & tested by hand • Drum being machined • Four home-made non-magnetic actuators made; one tested • PCBs for opto-sensors made & stuffed • Mods to electronics crate ~ finished • Not committed to final front panel yet (cosmetics) • Still to finalise design of air crate • Need some experience of pneumatic actuators • Progress limited by • Availability of effort / CNC machines / my availability to chase

  3. Technical problems • Proved tricky to machine 4mm thick SS “inner rings” • Aluminium not good enough • Need to grind machined SS flat • Tolerances of slots in petals are tricky • Long lever arm to centre • 0.05 mm gets multiplied by ~8 when closed • Unsightly gaps at centre (bad teeth!) • ~1% physics problem • Mainly annoying • But may be worse with Tungsten • Examining solutions We want to play with some slots & holes in some gash tungsten before cutting the petals – expensive material

  4. SCHEDULE Main hold up is availability of effort (including me & V.B.) & machines Mechanics finished “not before Easter” (24 April)