1 / 17

Feasibility Study Schemes:

Feasibility Study Schemes: ·  Scheme 1 —Renovating and expanding the meetinghouse. This scheme moves the meetinghouse about 20 ft. west, converts it to a social space and central circulation space, and constructs a new sanctuary behind it.

Download Presentation

Feasibility Study Schemes:

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Feasibility Study Schemes: · Scheme 1—Renovating and expanding the meetinghouse. This scheme moves the meetinghouse about 20 ft. west, converts it to a social space and central circulation space, and constructs a new sanctuary behind it. · Scheme 2—Building a new meetinghouse on a different (hypothetical) site. This scheme proposes a new, single-story building on an open site as near as possible to Amherst Center. · Scheme 3—Building a new meetinghouse on the current site. This scheme removes the original meetinghouse and builds new, with the sanctuary facing North Pleasant Street, and the social space to the rear.

  2. COST COMPARISONS

  3. PHASED APPROACH – NEW BUILDING ON THE EXISTING SITE IN TWO PHASES

  4. SANCTUARY PORTION OF EXISTING STRUCTURE TO REMAIN IN PHASE ONE NEW ADDITION NEW 13-CAR PARKING LOT PROPOSED PHASE ONE PORTION OF EXISTING STRUCTURE TO BE REMOVED AS PART OF PHASE ONE EXISTING PHASE ONE – NEW ADDITION AND NEW PARKING

  5. UPPER LEVEL – 3490 SQ.FT. TOTAL NEW AREA PHASE ONE 6840 SQ.FT. LOWER LEVEL – 3350 SQ.FT. PHASE ONE – NEW ADDITION AND NEW PARKING

  6. PHASE TWO ADDITION (NEW SANCTUARY) PHASE ONE PROPOSED PHASE TWO REMAINDER OF EXISTING STRUCTURE TO BE REMOVED AS PART OF PHASE 2 PHASE ONE PHASE TWO – NEW SANCTUARY ADDTION

  7. UPPER LEVEL – 3490 SQ.FT. TOTAL PHASE ONE AREA 6,840 SQ.FT. TOTAL PHASE TWO AREA 6,900 SQ.FT. TOTAL 13,740 SQ.FT. LOWER LEVEL – 3410 SQ.FT. PHASE TWO – NEW SANCTUARY ADDITION

  8. UNITARIAN UNIVERSALIST SOCIETY OF AMHERST

  9. “As we look to the future and consider a new meetinghouse, we are interested in a facility that allows us to pursue our mission of spiritual development, greater and more diverse fellowship opportunities, community service and social justice in bigger ways, reflects our principles and values, and is welcoming to the larger community. We are committed to: · Remaining visible in the community · Being accessible to our current and future members · Having a space that meets and enhances our spiritual pursuits · Meeting our religious educational needs · Reaching others in the community who may be seeking what we have to offer · Existing in harmony with our environment” COMMITMENTS

  10. PROGRAM SPACE GOALS

  11. EXISTING SITE PLAN

  12. STUDY SCHEME 1 - RENOVATION & EXPANSION OF EXISTING BUILDING

  13. STUDY SCHEME 1 - RENOVATION & EXPANSION OF EXISTING BUILDING

  14. STUDY SCHEME 3 – NEW BUILDING ON THE EXISTING SITE

  15. STUDY SCHEME 3 – NEW BUILDING ON THE EXISTING SITE

  16. FEASIBILITY STUDY UNITARIAN UNIVERSALIST SOCIETY OF AMHERST PRESENTATION OF FINAL REPORT with KUHN RIDDLE ARCHITECTS and BERKSHIRE DESIGN GROUP