1 / 21

Implementing air quality e-Reporting Core requirements by December 2013

Implementing air quality e-Reporting Core requirements by December 2013. Jaume Targa 18 th EIONET Workshop AQAM Dublin, Ireland 24 th October 2013. European Environment Agency. COUNTDOWN. 62 days to X-mas 68 days to e-Reporting. Too much information? Should I worry?

calum
Download Presentation

Implementing air quality e-Reporting Core requirements by December 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Implementing air quality e-ReportingCore requirements by December 2013 Jaume Targa 18th EIONET Workshop AQAM Dublin, Ireland 24th October 2013 European Environment Agency

  2. COUNTDOWN • 62 days to X-mas • 68 days to e-Reporting • Too much information? • Should I worry? • What’s essential?

  3. Content • Core requirements by end 2013 • Air Quality Zones (B) • Assessment regimes (C) • Assessment methods (D) • Primary Up To Date data (E2a)

  4. Core requirements • Need to provide the monitoring strategy for 2014 • Zones in 2014 • Regime in place to assess AQ in 2014 • Minimum information on methods used • All to be reported to EEA via CDR • Countries can use any tool to generate XML: • In-house tools • AQUI • Any combination of these

  5. Common – Reporting header • AQ e-Reporting header

  6. Air Quality Zones (B)

  7. Air Quality Zones (B) • 21 mandatory fields

  8. Air Quality Zones (B)

  9. Assessment Regime (C) Provides information on how air quality is assessed in each zone.

  10. Assessment Regime (C) • 18 mandatory fields

  11. Assessment Regime (C)

  12. Closer look at the 8 new AQ data themes AQ assessment methods Data flow deliverables for end 2013

  13. 36 mandatory fields for fixed points inc. Data flow deliverables for end 2013

  14. 36 mandatory fields for fixed points Data flow deliverables for end 2013

  15. D – Assessment Methods – Fixed/Indicative

  16. 4 data flow deliverables overall Don’t forget to your Near Real Time datafeeds now called up-to-date data (UTD) Summary of deliverables December 2013

  17. E –Primary data (AQ elements only)

  18. E –Primary data (AQ elements only)

  19. Summary of data flows and linkages

  20. Any Questions ?

  21. Contact to ETC/ACM Jaume Targa Principal consultant 4sfera Innova m. +34 679 38 01 01e.jaume.targa@4sfera.com skypejaume.targa.4sfera twitter@4sferawebwww.4sfera.com You can follow us on twitter @4sfera Mobile App just launched on Apple Store - Europe Air (trun.cat/air)

More Related