THEMIS Status (since Receiving Review 2007.06.28) NASA/GSFC, Oct 26, 2007

THEMIS Status (since Receiving Review 2007.06.28) NASA/GSFC, Oct 26, 2007. Mission Profile Overview. Q1 period. Dayside (Coast Phase): Checkout and Serendipetous science. Starting point: launch configuration. TH-B. TH-C. TH-B. TH-D. TH-C. TH-D. TH-E. TH-A. TH-E. TH-A.

Download Presentation

THEMIS Status (since Receiving Review 2007.06.28) NASA/GSFC, Oct 26, 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. THEMIS Status(since Receiving Review 2007.06.28) NASA/GSFC, Oct 26, 2007

  2. Mission Profile Overview Q1 period

  3. Dayside (Coast Phase): Checkout and Serendipetous science Starting point: launch configuration TH-B TH-C TH-B TH-D TH-C TH-D TH-E TH-A TH-E TH-A

  4. Dayside: Spacecraft • Constellation status • Orbits and Attitudes • 31.3hr Orbit Periods (RA=14.6RE) • Spin axis ecliptic science North (+8deg towards Sun on Feb 7, 2008) • Configuration: • B-------------------C-D-E--------------------A---- 5,000km 200km 5,000km • Spacecraft Status: All spacecraft healthy, performing nominally

  5. Dayside: Instruments • Instrument status • All Powered ON and Nominal • Instrument behavior: • FGM 11Hz noise persists, identified as ETC 32sector sampling • Difficult but not impossible to clean • SCM and FGM spin tone harmonics • Software cleanup on SCM (1m) done, on FGM (2m boom) awaiting testing

  6. Dayside: Instruments • Data acquisition modes • On-board moments corrected: late August 2007

  7. Dayside: Instruments

  8. Dayside: Instruments Instrument operations routine modes

  9. Dayside: Summary of Activities • Sequence of Events: • At: http://soleil.ssl.berkeley.edu/ground_systems/request_planning.themis.txt • Pass Coverage and Data Recovery: • Minor data losses only due to: • Beating of 31.3hr orbit with 24h rotation, and memory overfill • Lining up USN to improve outlook, and as backup • Pass statistics

  10. On board memory fill state records: • BTAPS, or available through hsk in THEMIS Data Analysis Tools Burst Memory full Collect Memory dump Survey Full

  11. Dayside: Summary of Activities • Normal Operations: • Pass supports, state-of-health monitoring, generation and uploading of tables, clock correlation, instrument ops. Lights-out support conducted. • Clock correlation and jamming (to adhere to 0.5s across) is typical. • Average clock drift rates: • TH-A TH-B TH-C TH-D TH-E • 8.9msec/d 4.5msec/d 4.0 msec/d 0.47msec/d 2.5msec/d • Thruster Utilization at end of dayside:

  12. Dayside: Anomaly Status • Mission totals to end-of-dayside: • 15 anomalies, • 11 closed by RR • 4 closed recently Closed Closed Closed Closed

  13. Dayside: Ground System • Mission Ops Center: • All tools function nominally (ITOS, SatTrack, BMPS, BTAPS, BEARS) • All systems under soft configuration freeze • SW/HW changes are reviewed, documented and approved by local CCB • Flight Dynamics • All tools function nominally (MDT, GMAN, GTDS) • Regular mission-life runs ensure conjunctions, fuel margins and shadows are maintained • OD performed 3times/wk ; AD performed 1time/wk • Automated generation of mission planning products (GSFC/FDAB backup) • Berkeley Ground Station • BGS functions nominally • Recent procurement of Microdyne RCB-3000 receiver improved link margin • Exciter (Agilent ESG 4422B) which had failed was refurbished • 200W Transmitter had an issue but was shipped to factory and fixed (100W OK) • External Ground Systems • NASA G/N; NASA S/N; GSFC/FDF; NISN continue their support to THEMIS • Wallops Ground Station has had problems (AGC level zeroing) but are worked on • Hartebeesthoek Ground Station (12m, 6m) experienced problems but being fixed • USN (Australia, Hawaii) are being lined up for THEMIS.

  14. Dayside: Data Processing • Science Data Processing • L0, L1 and L2 data automatically generated within <1hr from receipt. • Tohban-process checks data fidelity to catch issues almost real-time. • DVD production system recently installed for backup media • Data plots on the web with 2hr latency • Data gaps backfilled by reprocessing of packets subsequent passes (1-2days later) • Automated reprocessing upon arrival of any new data • Processing Software Status • Quality Assurance checks on “released version” completed: July 31 (V2.0) • Production of L1, L2 data and overview plots • Available for distribution to the world (http://themis.ssl.berkeley.edu/software) • Support through on-line form or email (THEMIS_Science_Support@ssl)

  15. Data Processing (…cont.) L0: packets (THEMIS web / TDAS) L1: raw uncalibrated, CDFs (THEMIS web / TDAS) L2: physical, calibrated, CDFs (… plus SPDF) … soon also through VxOs p. 1

  16. Data Processing (…cont.) • L1 Data: • Now contain: • Everything • L2 Data: • Now contain: • Full resolution B-field • Spin resolution E-field • Omni-spectra ESA, SST • Filterbank waves • SS gmoms @ 5min • By Dec. 07 will contain: • FS gmoms @ 3sec resolution • SS moms @ 3sec resolution • By Feb. 07 will contain: • Full resolution SCM data • (& possibly full res. Exy, Edot0) p. 2

  17. Dayside: Data Validation • Tohban (scientist-in-charge) performs routing data quality checks • See: http://sprg.ssl.berkeley.edu/~themistohban/ • Data gaps, FS, PB captures, mode switches – informs of problems • Filters instrument requests to instrument engineer (Ludlam),so that scientists speak with ONE voice • Reports weekly status during Mission Operations Meetings; plots interesting data

  18. Data Validation (…cont.)

  19. Data Delivery • Data and software delivery of L0, L1, L2 data through UCB • See: http://sprg.ssl.berkeley.edu/data/ • Machine independent, IDL-based software downloads seamlessly the THEMIS data in CDF (machine independent Format) • Latency = 2hrs from data receipt on the ground • Data and software delivery of L2 data through SPDF • See: http://spdf.gsfc.nasa.gov/ • Documented physical quantities in CDF, readable by any software (IDL, Matlab, C++) • Data and software delivery of L2 data through VxOs • Working directly with Jan Merka (spacecraft) and Ray Walker/Todd King (gmags) • Defining SPASE+ model for THEMIS and describe dataset • Developing SOAP interface for Remote procedure calls (RPCs) from VMO • Designing/creating basic search procs for VMO middleware to return pointers • Defining advanced search procedures for higher resolution, or transformed data

  20. Dayside: Event detection • Web-based overview plot distribution (http://themis.ssl.berkeley.edu/data): • Single spacecraft 24 hr, 6 hr overviews • Multi-spacecraft overviews (FGM now available, ESA soon) • Orbit views • GBO GMAG stackplots (High- & Mid-Lat for H, D, Z)

  21. Coast, Placement and Tail Phases http://sscweb.gsfc.nasa.gov/tipsod/ Coast (Jun –Sep, 2007) Placement Sep-Dec, 2007) Tail 1 (Jan-Mar, 2008)

  22. Placement: Status Overview • Proceeding Nominally • Most maneuvers completed • P1 (TH-B), P2 (TH-C), P3 (TH-D), P4 (TH-E), near final orbits • P1, P2 turned to near-final attitudes (ecliptic science south) • Short-term science took secondary priority during this placement period • ESAs were turned OFF for a few weeks to simplify operations (most back ON now) • Data retrieval was curtailed due to: • Non-optimal attitudes (probes left to fire attitude thru several orbits) • Maneuver contacts at perigee took precedence over data dumps • Software uploads (compression, triggers, FS) lagged behind (now starting again) • FSW 4.8 upload on TH-A, B done, next is C, D, E (fixes compression, Ni triggers) • Mission Ops personnel focused on safe placement • Maneuver planning/replanning in response to inadvertent aborts • Long term (end-to-end) mission design stability to achieve mission goals • Achieved most placement events while maintaining mission objectives: • Accurate orbit placement for tail season • First and second year conjunctions > 250hrs/yr (Baseline=188hrs/yr) • First and second year shadows <3hrs (meets design limits) • End-of-mission dV expected on P1 = 300m/s (80% over the remaining dV) • Issues (minor, non-critical): • Tank local temperature swings due to lower heat capacity; cycling faster now. Watch. • Thanks to the efforts of the dedicated individuals of the Msn Ops Team !! • Special Thanks to MOM, Manfred Bester, for his Leadership and Focus.

  23. Placement: Science Data Dumps Spotty – Priority on Maneuvers • Still… Collected most survey data. Interesting on-board FGM/FIT data collected during this period Burst Memory full Survey Full

  24. Placement: Outlook • Spacecraft • P3,4 into sidereal periods by Oct 30th & Nov 3rd • P5 (TH-A) starts placement maneuvers once P1’s EFI booms are out (Nov 17) • Instruments • All ESAs to be turned ON by next week • P1 EFI boom deployment plans developed (EFI expected out by Nov 17) • P5 EFI booms to come out shortly after its placement (early January) • Data Collection • Missing magnetopause crossings on P3,4 (too close@12RE) – Revising FS plan: • Start Tail-Like science operations early (WD-88d I.e., Nov 3) • FS during conjunctions • One-day GBO conjunctions for P3,4,5 (0-12 UT) • Two-day conjunctions for P2 • Four-day conjunctions for P1 • Particle Burst using Vxy, Bz • Wave Burst using FBK triggers • Benefits: • Practice tail-alignment operations early • Dawn-side science captures dawn flank at multiple distances • Can plan radar conjunctions (AMISR, SuperDARN) from now • Investigating early EFI deployment on P5