1 / 5

WASTE-TO-ENERGY PLANTS

WASTE-TO-ENERGY PLANTS. SELECTED REFERENCES. Selected references – Waste-to-Energy plants. Selected references – Vestforbrænding WtE Glostrup, Denmark, 500,000 t/year. Main plant data Thermal treatment 500,000 t/year New line 6 Power output 22 MWe District heating output 70 MJ/s

Download Presentation

WASTE-TO-ENERGY PLANTS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WASTE-TO-ENERGY PLANTS SELECTED REFERENCES

  2. Selected references – Waste-to-Energy plants Doc. info 255424

  3. Selected references – Vestforbrænding WtEGlostrup, Denmark, 500,000 t/year Main plant data Thermal treatment 500,000 t/year New line 6 Power output 22 MWe District heating output 70 MJ/s Steam data 55 bar/380 °C Power efficiency 21% Total efficiency 86% Line 6 35 t/h Net calorific value (design) 11 MJ/kg Annual operating time 8,100 hours Commissioning 2005 Doc. info 255424 Services provided by DONG Energy - Owner’s engineer for procurement, negotiation and follow-up on all technical contacts for the dioxin and SNCR filter installations. - Owner’s engineer for procurement, negotiation and follow-up on all technical and civil contacts for the new line 6 (35 t/h). - Procurement of residual products. - Optimisation of extended Inconel cladding for line 5 (26 t/h). - Operator training programme.

  4. Selected references – Odense W-t-EOdense, Denmark, 250,000 t/year Main plant data Thermal treatment 250,000 t/year Power output 20 MWe District heating output 65 MJ/s Steam data 65 bar/380 °C Power efficiency 22% Total efficiency 92% (LHV) Lines 2x8 t/h 1x18 t/h Net calorific value (design) 11 MJ/kg Annual operating time 8,100 hours Commissioning 1996-2000 Doc. info 255424 Services provided by DONG Energy - Owner’s engineer for feasibility study and conceptual design as well as procurement, negotiation and follow-up on all technical and civil contacts. - Commissioning and maintenance planning. - Procurement of residual products. - Optimisation of operation costs. - Planning of retrofit with Inconel cladding.

  5. Selected references – Jönköping W-t-EKraftvärmeverket Torsvik, Jönköping, Sweden, 160,000 t/year Main plant data Thermal treatment 160,000 t/year Power output 13 MWe (gross) Districtheating output 37+14 MJ/s Steam data 40 bar/380 °C Power efficiency 21% (gross) Total efficiency 102% (LHV) Lines 120 t/h Net calorific value (design) 11 MJ/kg Annual operating time 8,000 hours Commissioning 2006 Doc. info 255424 • Services provided by DONG Energy • - Owner’s engineer for the total facility during all project stages from planning to commissioning. • Conceptual design and feasibility study to obtain an overall optimum plant design. • Completion of Architectural Competition Program. • Procurement and negotiation of all process and civil construction contracts. • Commissioning of the facility.

More Related