Predictive Models to Achieve Business Results Place your image on top of this gray box. If no graphic i applicable, delete gray box and notch-out behind gray box,fromthe Title Master 19th International Forum on COCOMO and Software Cost Modeling Cvetan Redzic, Michael Crowley, Nancy Eickelmann, Jongmoon Baik Motorola, Inc. October 26, 2004
Outline • Overview • Business Goals • Models Used • COQUALMO • CoQ-DES • MotoROI • Primary Model Inputs • CMM • Life Cycle Scope • PCE / PSE • Results • Cost • Quality
+ Satisfier Features 3 Delighters Attractive 2 Quality 1 Must Be - Business Goal – Improved Customer Satisfaction SW Quality • Type of needs • Basic Expectations (Must Be) • Satisfier - Features • Delighters (Attractive) Kano Analysis
Improved Customer Satisfaction Cause & Effect Diagram
Integrating Predictive Models • Models Used • COQUALMO • CoQ-DES • MotoROI
Model Integration - Primary Model Inputs • CMM • Life Cycle • PCE / PSE
CMM – Process Maturity • COQUALMO • PMAT (process maturity has the greatest +/-impact) on injection rates • CoQ-DES • Not Used directly but is inherent in organizational calibration • MotoROI • Process maturity as represented by the cost of quality/cost of poor quality financial structure is a primary factor. Knox Theoretical Model of TCOQ (About 50% at CMM Level 3)
Requirement System Test Design Component/Integration Test Testing Inspections Implementation Unit Test Code Life Cycle • COQUALMO • Req., Des., Imp., and Code • CoQ-DES • Full Life Cycle • MotoROI • Full Life Cycle or Individual Phases
PCE and PSE • COQUALMO • PCE and PSE as evidenced by injection and removal rates • CoQ-DES • PCE and PSE as evidenced by injection and removal rates • MotoROI • PCE for DP or PSE for technology effectiveness Phase Containment Effectiveness & Phase Screening Effectiveness
Measuring and Monitoring Results • Quality • Cost
Quality - Sources of Variation For Release with about 100 Delta KLOC, no significant difference estimates & actuals in DI & DR For large size Release over 100 Delta KLOC, there is significant difference b/w estimates & actuals in DI & DR for Code Actual vs. COQUALMO Estimate
Quality - Sigma Level From PCE, SRE & CRUD data Sigma Level: Defects per Million Opportunities DPMO = 1M * D/(N*O) D = 2464 HS Faults (from PCE) N = 139,595 Delta LOC DPMO = 1M * 2464/139,595 DPMO = 17651 - 3.61 s Stable processes Need Leap improvement: SEI CMM Level 5 TCM • What is Sigma Level from release perspective ? • Relatively stable across the releases
Quality - Impact of Tactical Changes Monte-Carlo simulation, to include uncertainty & risks In the expert based opinion
Quality - Vital X Monthly Review Charts Fault Injection & Removal vs. Baselines
Summary • Integrating predictive models provides multiple views of project quality, cost and schedule issues. • More accurate predictions of defect injection are possible • More accurate predictions of defect removal are possible • More accurate predictions of overall staffing and project cost are possible