260 likes | 972 Views
ASCP - 101. A Beginners Guide to Implementing ASCP Sandeep Gandhi Independent Consultant. Agenda. Scope ASCP v/s MRP ASCP Data Flow Setups Item Attributes Plan Options Execute Plan Q&A. Advanced Supply Chain Planning.
E N D
ASCP - 101 A Beginners Guide to Implementing ASCP Sandeep Gandhi Independent Consultant
Agenda • Scope • ASCP v/s MRP • ASCP Data Flow • Setups • Item Attributes • Plan Options • Execute Plan • Q&A
Advanced Supply Chain Planning Oracle Advanced Supply Chain Planning (ASCP) is a comprehensive planning solution that decides when and where supplies should be deployed within an extended supply chain. • Key Capabilities • Plan all supply chain facilities simultaneously • Short-term detailed scheduling and long-term aggregate planning are supported within a single plan • Plans that consider both resource and material constraints • Configure Oracle ASCP to optimize specific business criteria • Allows many types of changes to supply, demand and resources to simulate changing business conditions • Integrated solution
ASCP v/s MRP • Oracle’s focus product • Productivity enhancing UI • QOH shown in supply/demand screen • Multi-level pegging • Ability to define queries and publish to planners • Vertical Plan / Gnatt Chart • Plan alt. sources and alt. resources • Plan with optimization rules (inv turns / ontime delivery) and penalty factors • Constrained plan (ECC / EDD / lead time constraints) • VMI Support • New reports • Powerful simulations • Different calendars for shipping / manufacturing / receiving • Multiple instance planning
Initial Setups – contd. Run full data collection
Initial Setups – contd. • Gather schema stats on MSC • Grant Org access
Collecting Sales Orders • Define Demand class • Define Master Demand Schedule (MDS) • Refresh MDS
Execute Plan • Refresh MDS • Run Data Collection • Run Custom Data Cleanup Programs • Run plan • Consider creating request set • Access Planner’s workbench
Gotchyas • Sales order demand duplicated • Inactive items coming over to plan • Can not release configured items • Planning Data Pull very slow • Run Refresh Collection Snapshots often • Run Net change collection • ODS Load takes a long time • Set MSC:Purge Stg Tbl Cntrl to Yes • Plan takes a long time to run • Set MSC: Share Plan Partitions to No • File space issues • Set MSC:Write MBP Flat Files to Yes • Schema stats
Q&A Sandeep Gandhi sandeep.gandhi@usa.net 513-325-9026