1 / 13

EVLA Monitor and Control

EVLA Monitor and Control. Monitor & Control Transition. Antennas. Antennas – Front Ends  Not all Front Ends Will Be EVLA Until 2010  F320 FE Transition Module Interfaces up to Two F14’s  Uses A/D Design by George Peck  In-House Design Simulates VLA Dataset. Antennas.

carina
Download Presentation

EVLA Monitor and Control

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EVLA Monitor and Control Monitor & Control Transition EVLA Monitor & Control Hardware CDR October 20, 2004

  2. Antennas • Antennas – Front Ends  Not all Front Ends Will Be EVLA Until 2010  F320 FE Transition Module • Interfaces up to Two F14’s  Uses A/D Design by George Peck  In-House Design Simulates VLA Dataset EVLA Monitor & Control Hardware CDR October 20, 2004

  3. Antennas • Antennas – Wye Monitor System  M302 Utility Interface Replacement  Wye-Com Cable Will Disappear  Reduce Two M&C Systems into One  Consolidate Functions to Their Devices  Reduce Number of External Functions EVLA Monitor & Control Hardware CDR October 20, 2004

  4. Antennas • Antennas – ACU and FRM Systems  ACU & FRM System Replacements Not Part of EVLA Phase I  Bob Broilo Designed Interface  Interface is Between MIB and DCS System  ACU & FRM if Replaced Early Will be Paid by Operations or EVLA Contingency EVLA Monitor & Control Hardware CDR October 20, 2004

  5. Control Building • Control Building To Antennas EVLA Antennas Connect to EVLA M&C  Includes Transition Modules SLC Operates VLA Antennas  Operates EVLA at VLA Baseband Until New Correlator is Installed  No VLA Baseband Transition for the New Correlator EVLA Monitor & Control Hardware CDR October 20, 2004

  6. Control Building • Control Building to Master Rack  EVLA Master Rack Connected to EVLA M&C • SLC Controls VLA Master Rack • SLC is Connected to Modcomps  Upon Modcomp Retirement SLC will be Placed under Control of EVLA M&C EVLA Monitor & Control Hardware CDR October 20, 2004

  7. VLA EVLA Monitor & Control Hardware CDR October 20, 2004

  8. EVLA & VLA (I) EVLA Monitor & Control Hardware CDR October 20, 2004

  9. EVLA & VLA (II) EVLA Monitor & Control Hardware CDR October 20, 2004

  10. Control Building • Weather Station  Connected to VLA Master Rack  Interfaces Re-Designed for EVLA  Modernized Weather Instrumentation  Fiber Run to Weather Station in Place EVLA Monitor & Control Hardware CDR October 20, 2004

  11. Control Building • Control Building to Wye Monitor System  HVACs, UPS’s, and Generators  Interfaces Re-Designed for EVLA  Fiber Runs to Generator Building, Etc. EVLA Monitor & Control Hardware CDR October 20, 2004

  12. Control Building • Control Building to Other  Atmospheric Phase Interferometer (API)  Modernized API for EVLA  VLBI/VLBA Racks  Interface Hooks to EVLA M&C EVLA Monitor & Control Hardware CDR October 20, 2004

  13. Control Building • Control Building to Other  HTRP or Pulsar Equipment Racks  Stand-Alone – Provide EVLA Hooks  New Correlator Provides Improved Capabilities for Pulsar Work  Pie Town Link  Modernized to EVLA in Future  Part of Phase II EVLA Monitor & Control Hardware CDR October 20, 2004