An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EVLA Monitor and Control Monitor & Control Transition EVLA Monitor & Control Hardware PDR March 13, 2002

  2. Antennas • Antennas – Front Ends  Not all Front Ends Will Be EVLA  EVLA Interface to F14’s Required EVLA Monitor & Control Hardware PDR March 13, 2002

  3. Antennas • Antennas – Wye Monitor System  Interface Re-Designed for EVLA  MIB to MIB Communications  Consolidate Functions to Devices EVLA Monitor & Control Hardware PDR March 13, 2002

  4. Control Building • Control Building – Antenna Interface New Modules Connect to EVLA M&C  Includes Temporary Modules SLC Operates VLA Antennas  Operates EVLA at VLA Baseband • SLC Operated By Modcomps or EVLA Machine EVLA Monitor & Control Hardware PDR March 13, 2002

  5. Control Building • Control Building – Master Rack  SLC Controls VLA Master Rack • EVLA Master Rack Connected to EVLA M&C • Weather Station  Interfaces Re-Designed for EVLA  Modernized Weather Instrumentation  Fiber Run to Weather Station EVLA Monitor & Control Hardware PDR March 13, 2002

  6. Control Building • Control Building – Wye Monitor System  HVACs, UPS’s, and Generators  Interfaces Re-Designed for EVLA  Fiber Run to Generator Building  Modcomps Software Watchdogs  EVLA Requirements? EVLA Monitor & Control Hardware PDR March 13, 2002

  7. Control Building • Control Building – Other  Atmospheric Phase Interferometer (API)  VLBI/VLBA Racks  HTRP or Pulsar Equipment Racks  Pie Town Link  IAT Clock EVLA Monitor & Control Hardware PDR March 13, 2002

More Related