An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CSU Water Resources UpdateWater Forum – CMUOct 31st 2011 Denis Reich Water Resources Specialist CSU – Grand Junction

  2. Overview CSU- UppCRBForum • Colorado Water Institute • CSU Extension and Water • 4 Projects of varying scope: • Orchard Irrigation • Small Acreage Outreach • CoAgMet Improvements • CRB Ag Water Security

  3. Colorado Water Institute CSU- UppCRBForum • Under the Office of Engagement at CSU • Same as Extension • Director: Reagan Waskom • also manages the “Colorado Water” Center USGS CWI CSU Office of Engagement Extension Conduit between academia and public need

  4. CSU Extension and Water CSU- UppCRBForum • Extension Water Resources Team • 4 On-campus Specialists: Fort Collins • 3 Field Specialists: Akron, Pueblo, Grand Junction • Additional support: CWI, Colleges of Engineering and Agriculture • Broad Scope: • Basic and Applied Research • Irrigation Management • NRCS, CDA, CCC • Water Quality • Stakeholder Processes • Watershed Groups • IBCC, SeTF

  5. Project 1: RDI in Peach Orchards CSU- UppCRBForum • Project Trigger: • “Yellow” Trees – chlorosis • Potential for Saved Water • Orchard IWM pieces missing • History: • Since 2008 in Palisade • Completing 3rd year of RDI trials • First year of Research Center plots Unnecessary Irrigation = Yellow Trees • Current Work • Maximizing: • Seasonal Efficiency (RDI) • Applied Efficiency • Reducing unwanted growth • Support • Reclamation WCFSP 2 years $25K • CSU Extension 2 years $10K RDI uses soil moisture sensing to take advantage of Peach growth stages

  6. Project 1: RDI in Peach Orchards CSU- UppCRBForum • Major Findings: • RDI Possible: reduces sucker growth • Needs new management habits • Influence of rain unclear • Future Work: • Quantify salt and water savings • Design and disperse outreach tools

  7. Project 2: Irrigation Ambassador CSU- UppCRBForum • Project Trigger: • Education for new irrigators • Standing irrigation water = mozzies • History: • Piloted by CSU Extension 2010 • Contracted Ambassador with Mesa Conservation District in 2010 Reaching the target audience has proved challenging • Current Work • Reporting and Evaluation of 2011 • Lessons Learned • Support • Pilot: CSU Extension $5K • 2011: Colorado Roundtable $18K • GRMCD $7K • GVIC, GVWUA $1K Mosquitoes have proved an effective hook for the program

  8. Project 2: Irrigation Ambassador CSU- UppCRBForum • Major Impacts: • 2009: Protocol and 12 pilot visits • 2010: 59 visits / 2 major drain fixes • Future Work: • Build Capacity for 2012 and beyond • Expand to Delta and Montrose Co.’s • Outreach Video Visit photos: “duck habitat”

  9. Project 3: CoAgMet upgrades CSU- UppCRBForum Atmometers used for site testing The relocated GJ station in Olathe • Project Trigger: • Efficiency: Salt and Selenium • EQIP Contract requirements (NRCS) • History: • Sole source of crop CU data in state • Assists with pesticide application • CoAgMet challenged for funding CoAgMet Station • Current Work • GJ Station to Olathe 2010 • Site testing for future locations • Support • Water Supply Reserve Account $112K: • Gunnison Basin Roundtable • CWCB • Host Producers $7K/station + $2K/yr Station Service Ended New or Proposed Station

  10. Project 4: CRB Water Security CSU- UppCRBForum • Project Trigger: • Rapid Population Growth • Ag Water is the likely future source • History: • Federal Agencies spending on CRB • Barriers to cooperative solutions • Can Ag/M&I/Env/O&G share water? • Current Work (PD: Reagan Waskom) • “Water Sharing” Workshops / Tours • Building a Basin-wide Team • Support • Walton Foundation • USDA-NIFA Planning Grant • In-Kind from 6 of 7 basin states

  11. Projects Summary CSU- UppCRBForum 4: Security Conservation Education Efficiency