An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GTSI Green Calculator Joshua Bradfield Data Center Solutions Manager GTSI Corp.

  2. Infrastructure Prior to Virtualization 150 263 49,700 57,155 $47,924 $83,819 $59,905 $104,774 $107,828 $188,593

  3. Infrastructure After Virtualization 6 10 3,000 5,000 2,010 3,350 $4,831 $8,052 $6,039 $10,064 $10,870 $18,116

  4. So What Are The Totals? Servers Watts Cost Space 90% 6 5,010 $10,870 1

  5. Return On Investment (ROI) But what if we shot for 80% utilization instead of 60%? Breakeven = 4.8 years ROI 5 Years: 9.2

  6. What about at 80% utilization? Breakeven = 3.6 years ROI 5 Years: 29.4 Try it yourself at www.gtsi.com/greencalculator