1 / 8

Aviation System Standards Flight Inspection Flight Procedures Aeronautical Charting

Aviation System Standards Flight Inspection Flight Procedures Aeronautical Charting. Develop and Maintain Instrument Flight Procedures (over 14,000) Airborne Inspection of Navigation and Visual Aids Airborne Inspection of Instrument Flight Procedures and the data supporting the procedure

Download Presentation

Aviation System Standards Flight Inspection Flight Procedures Aeronautical Charting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Aviation System StandardsFlight InspectionFlight ProceduresAeronautical Charting F E D E R A L A V I A T I O N A D M I N I S T R A T I O N • A I R T R A F F I C O R G A N I Z A T I O N

  2. Develop and Maintain Instrument Flight Procedures (over 14,000) • Airborne Inspection of Navigation and Visual Aids • Airborne Inspection of Instrument Flight Procedures and the data supporting the procedure • Print and Distribute Aeronautical Charts • Publish the National Flight Data Base (an ARINC 424 coded public flight procedures data base) F E D E R A L A V I A T I O N A D M I N I S T R A T I O N • A I R T R A F F I C O R G A N I Z A T I O N

  3. Projects in the Pacific • Maldives Mobile VOR installed after Tsunami • NDB Restoral and Vortac commissioning Diego Garcia • Lanai ILS Glideslope Special to obtain reference data • Lihue Vortac Special to determine affect of barbed wire fence around the facility • Hana RNAV (GPS) runway 26 and RWY 8 Publication date 09/01/05 • Hana Departure Procedure Publication 09/01/05 • Guam ILS Rwy 06R ?????? F E D E R A L A V I A T I O N A D M I N I S T R A T I O N • A I R T R A F F I C O R G A N I Z A T I O N

  4. Airport Construction / Obstructions • Airport Construction • Could have adverse affect on published procedures, or development of future procedures • Could cause cancellation of procedures and require undue delays in amending procedures without proper and prior coordination • Coordination required with Airports (ADOs) and Regional Flight Procedures Office • Obstructions • On or near airports • Could cause same effects as airport construction • Regional Air Traffic point of contact for filing Obstruction Evaluations (OEs) F E D E R A L A V I A T I O N A D M I N I S T R A T I O N • A I R T R A F F I C O R G A N I Z A T I O N

  5. Third Party Surveys • Guidance • Memorandum dated, 21 January 2005 Program Director, Aviation Systems Standards and Director, Office of Airport Safety and Standards • Point of Contact • Regional Flight Procedures Office Manager, Mike Vermuth, Telephone: 310-725-7122 • Processing • Through Regional Flight Procedures Office F E D E R A L A V I A T I O N A D M I N I S T R A T I O N • A I R T R A F F I C O R G A N I Z A T I O N

  6. RNAV Instrument Approach Procedures • LNAV • Only GPS is Required • LNAVs planned for Hana Airport, Rwys 26 and 8 on 01 September 2005 • LNAV / VNAV • Allows for Vertical Guidance using Barometric Altimeter • Aircraft Avionics is a Limiting Factor • LPV • WAAS Coverage in the Future' or greater • How to Request? • Regional Flight Procedures Office • Website: avn.faa.gov F E D E R A L A V I A T I O N A D M I N I S T R A T I O N • A I R T R A F F I C O R G A N I Z A T I O N

  7. NDB Procedures Cancellation & Decommissioning • NDB Procedures Cancellation • Proposed for Runway ends with at least one other Ground-based Procedure and a Space-based Procedure • Announced in Federal Register for Public Comment (comment period closed on 4 April 2005) • Proposed for Honolulu Intl. Rwy 8L, Kahului Rwy 20 • Alternative • Enter reimbursable agreement for annual maintenance and flight check • New NDB Procedures • Will be developed with reimbursable agreement • NDB Decommissioning • Only procedure will be cancelled initially • Each NDB will be evaluated for other usage. Ex: Missed approach holding, Final Approach FIX (FAF) identification (Associated with ILS) • Facility Decommissioning will be coordinated when a determination is made and the facility is no longer required F E D E R A L A V I A T I O N A D M I N I S T R A T I O N • A I R T R A F F I C O R G A N I Z A T I O N

  8. Web Address www.faa.avn.gov F E D E R A L A V I A T I O N A D M I N I S T R A T I O N • A I R T R A F F I C O R G A N I Z A T I O N

More Related