160 likes | 407 Views
Smart Assembly Systems. Objectives and Agenda Bob Tilove Technical Fellow, Manufacturing Systems Research Laboratory, General Motors R&D Visiting Scientist, Manufacturing Engineering Laboratory, NIST. SAFETY PROTOCOL. “Intelligence” in Agile Mfg Systems.
E N D
Smart Assembly Systems Objectives and Agenda Bob Tilove Technical Fellow, Manufacturing Systems Research Laboratory, General Motors R&D Visiting Scientist, Manufacturing Engineering Laboratory, NIST
“Intelligence” in Agile Mfg Systems • Mechanical Systems, Sensors, Controls • Adaptive, automated, autonomous • “Intelligent” robotics, adaptive process control, etc. • People Systems and Decision Making • “Agility” in context of unanticipated change. Reconfigurable. • “Virtual” Product/Process design and validation • Diagnostics and prognostics • Enterprise analytics
What is “Smart Assembly”? Virtual Factory “Intelligent/Agile Equipment” Eg: Cooperative Robots “e-Enabled” Optimized Real-time Manufacturing Eg: Predictive Maintenance “Math-enabled” Virtual Product/Process Design and Validation Eg. Virtual Launch Is it Real? Or is it Virtual? Or is it a Hybrid?
What If These Worlds Merged? How could we leverage “virtual” capabilities in the plant? “Virtual Build” Reviews Line Balancing Human Factors/Ergo Operation and Job Element Descriptions Process Planning Product and Mfg Engineering “This is a very nice fly-through that you have shown me. When will I be able to use this on the plant floor to improve my operations?” (Paraphrased from GM Plant Manager) Virtual Training Operator/team leader led workplace optimization
What If These Worlds Merged? How could we leverage “real time data” capabilities in engineering? Layout Specifications Equipment Design Performance “Observed State” Asset Tracking “I can’t re-use 3-D layouts because they are obsolete soon after the equipment is installed” (Paraphrased from GM Layout Engineer)
What If These Worlds Merged? Or, maybe even… This one is “real” Workcell Simulation This one is “virtual”
Smart Assembly Space Virtual • Virtual Mfg Eng. & Validation: Math Tools & Processes e-Mfg e-Manufacturing: Real-time Optimized Manufacturing (“m” & “M”) Agile Smart Assembly Flexible Mfg System Infrastructure: Hardware Tools& Processes
Purpose Of Workshop To develop a (broad industry/academic) vision and to define the state of the art and needs in “Smart Assembly.” “Smart Assembly” refers to a next generation capability in assembly systems and technologies which integrate “virtual” and “real-time” methods in order to achieve dramatic improvements in productivity, lead-time, and agility for the design, engineering, validation, construction, installation, launch and operation of assembly processes and systems.
Scope (suggested…) • In scope: • Assembly processes and systems: putting parts/components together to make a product. • Mfg Engineering and Mfg Operations activities: mfg process planning, design, engineering, validation, construction, installation, launch and operation of assembly processes and systems. • Out of scope (despite importance!) • Product design and modeling for assembly • “Big M” manufacturing: enterprise analytics, supply chain, etc
Agenda – October 3 1:00 Welcome: Dale Hall, Director, Manufacturing Engineering Laboratory, NIST 1:10 Workshop Objectives, Format and Agenda: Bob Tilove, Technical Fellow GMR&D and NIST Visiting Scientist) 1:30 Plenary Session What are some of the problems that you are facing that “smart assembly” might help to address? What are some examples of future scenarios enabled by smart assembly? 1:30-2:00 Bryan Dods, Senior Manager, Advanced Manufacturing Research & Development; The Boeing Company 2:00-2:20 Thomas Babin, Fellow of Technical Staff, Motorola 2:20-2:45 Roland Menassa, Laboratory Group Manager, Agile Equipment and Processes, GM R&D Center What are the tough research problems (related to the design, engineering, validation, construction, installation, launch, and operation of assembly processes and systems) that must be solved to make “smart assembly” a reality? 2:45-3:15 Jack Hu, Professor of Mechanical Engineering, University of Michigan 3:15 Coffee Break
Agenda – October 3 3:40 Plenary Session - continued What are the tough implementation problems (infrastructure, standards) that must be solved to make “smart assembly” a reality? 3:40-4:10 Charlie Gifford, Director Lean Production Management, GE/Fanuc Automation 4:10-4:40 Mitch Vaughn, Chief Technology Officer, Production Management, UGS 4:40-5:10 Bob Brown, CEO Advisor, DELMIA Corp What are the most promising models and opportunities for leveraging and collaboration to accelerate the development and implementation of “smart assembly”? 5:10–5:40 Jim Caie, VP of Consulting, ARC Advisory Group 5:40 Wrap up and collection of Break-out Session Preferences – Bob Tilove 6:00 Shuttle Bus to Hotel 6:30 Reception, Hilton (Courtesy of USCAR) The plenary speakers have one view … we want to hear from everyone!!
Agenda – October 4 8:30 Coffee 9:00 Kickoff Breakout Sessions (Richard Neal) 9:15 Breakout Sessions and Working Lunch Session 1: End User Perspective Session 2: Research Science Perspective Session 3: Infrastructure/Standards Perspective Session 4: Systems Integration and Deployment Perspective Pick up lunch between 11:30 – 12:00 2:00 Reports from Breakout Sessions 3:40 Wrap up – Dale Hall, Bob Tilove 4:00 Adjourn
Break-out Section Preference Form You will find a form like this in your packet. Please complete it and return it to a facilitator before you leave today!!
Special Thanks To .. For hosting, organizing, …. For reception