State of play of inter-regional road charging project in Belgium

State of play of inter-regional road charging project in Belgium. Technical market consultation Brussels, 10 September 2012 Per Posma, Programme Manager Inter-Regional Project Management Office for Road Charging. Background.

carlow
Download Presentation

State of play of inter-regional road charging project in Belgium

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. State of play of inter-regional road charging project in Belgium Technical market consultation Brussels, 10 September 2012 Per Posma, Programme Manager Inter-Regional Project Management Office for Road Charging

  2. Background Belgium is a small country with large transit of Heavy Goods Vehicles: • Logistics hub with Ports of Antwerp, Zeebrugge, Ghent, Express distribution (TNT Hub Liège-Bierset, …), inland waterways, rail • Ultra-dense road network (57,8 km highway per 1000 km²) • Central location in the EU • Large population of passenger cars: • 5,8 million lights vehicles registered (11 million residents in the country) • Heavy tourist traffic in holiday seasons (north- south EU)

  3. Background Road charging is competence of the Regions in Belgium. Political Agreement between Flanders, Wallonia and Brussels Capital Region - to reform road taxes (21 January 2011): • Introduction of a kilometre-based intelligent road charge for trucks exceeding 3,5 tonnes, in 2013 • Introduction of an electronic road vignette for passenger cars, in 2013 • Co-ordinated reform of tax regime for vehicles Circulation Tax (VKB / TC) and Registration Tax (BIV / TMC) • Planning has been reviewed: end of project 2015, operational early 2016

  4. Governance model Decisions Gov. Brussels Region Gov. Flemish Region Gov. Walloon Region PoliticalCommittee representatives of 15 cabinets from the threeRegions Preparation of decisions Covering all aspects of project (DBFMO model): Technical Legal Financial … AdministrativeCommittee Representativesfrom relevant administrations from the threeRegions Consultant Project Management Office Co-ordination Technical/Financial /legal expertise Communication Experts fromRegions

  5. Basic principles of system • Core of the “Kilometre charge” for Heavy Goods Vehicles: • System based on GNSS and mobile communications technology • Self-installable OBU for both national and foreign users • Applicable to at least all Eurovignette roads, other roads can be added per Region • Belgium (the regions) will exit Eurovignette system • Core of the “Road Vignette” for Light Vehicles: • System based on Electronic Vignette, enforced by ANPR • Reform of road taxes based on environmental parameters of vehicle • Tests to assess feasability of Kilometre Charge for Light Vehicles

  6. Basic principles of system • Business and Organization model: • Creation of an interregional entity • One SSP for the three regions both for the kilometer charge and the road vignette • Monitored through interregional entity • Legal framework and tendering procedure : • Negotiation procedure leading to the tendering procedure • Legislative procedures: duration 15 months

  7. Basic principles of system • Key Performance Indicators: • Compensation SSP: availability based compensation payments - fixed and variable components • Based on the performance level penalties may be imposed • Measure performance through data mining • The SSP reports to the interregional entity about the agreed KPIs and performance requirements. • Contract Issues : • DBFMO contract: over a period of 1,5 – 2 years of construction, plus a fixed operational phase of 12 years following the Availability Date • Extendable by 3 periods of 1 year • Debt for the project has to remain ESR neutral

  8. Market Consultation • Preliminary Architecture will be subject to scrutiny by potential suppliers • and service providers: • Regions will ask industry representatives who wish to do so, to provide information on financial, technical and legal feasibility of ideas proposed in Preliminary Architecture • Information gathered during Market Consultation will be fed into the process of drafting the Final Architecture and Tender Document • No discrimination: every useful comment from industry will be welcome.

  9. Program schedule DefinitionPhase Consul- tation Phase Technicalpreparation Legal work Tender Implementation PoliticalAgreement 21/01/2011 Vision Document 03/2011 Start Pre-Study Fairway 08/2011 PreliminaryArchitecture Tender documents Contract with SSP Start construction Consultations FinalArchitecture Operational Phase 2011 2012 2013 2014 2015 2016 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q1 Q2 Q3 Q4 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q1 Q2 Q3 Q4

  10. More information ? • www.vlabruwa.be