CARSON CITY FREEWAY PHASE 2B-1. PHASE 2A. PHASE 2. PHASE 2B. CARSON CITY FREEWAY – PHASE 2. PHASE 2A FUN RUN. PHASE 2B-1 MAJOR FEATURES CLEARVIEW TO FAIRVIEW DRIVE. Clearview Drive Bridge Koontz Lane Bridge Resurfacing of Edmonds Drive Intersection Clearview Drive Koontz Lane
E N D
CARSON CITY FREEWAY PHASE 2B-1 PHASE 2A PHASE 2 PHASE 2B
PHASE 2B-1 MAJOR FEATURESCLEARVIEW TO FAIRVIEW DRIVE • Clearview Drive Bridge • Koontz Lane Bridge • Resurfacing of Edmonds Drive Intersection • Clearview Drive • Koontz Lane • Closure of Valley View Drive • Closure of Colorado Street • Construct Cul-De-Sac • Drainage Facilities • Concrete Lined Channels and Box Culverts • Local Street Drainage • Landscaping – Topsoil and Hydroseeding of Disturbed Areas • Utility Relocations • Carson City Water Lines • Southwest Gas, NV Energy, AT & T and Charter Cable Estimated Construction Cost $15 Million
CLEARVIEWDRIVE KOONTZ LANE VALLEY VIEW DRIVE LINE DRIVE R/W DRAINAGE CHANNEL S. EDMONDS DRIVE R/W
COLORADOSTREET FAIRVIEW DRIVE INTERCHANGE R/W DRAINAGE CHANNEL S. EDMONDS DRIVE R/W
CARSON CANYON AT KOONTZ LANE BRIDGE LANDSCAPING – CARSON CITY ENHANCEMENTS
CARSON CITY FREEWAY – PHASE 2 Typical Section with Channel DRAINAGE CHANNEL EXISTING GROUND
CLEARVIEWDRIVE R/W LINE DRIVE G AT & T TEMP. WATER LINE NV ENERGY DRAINAGE CHANNEL W TEMP. AT & T EDMONDS DRIVE R/W
VALLEY VIEW DRIVE KOONTZ LANE R/W G W TEMP. WATER NV ENERGY TEMP. GAS DRAINAGE CHANNEL S. EDMONDS DRIVE R/W
COLORADO STREET CLOSED VALLEY VIEW DRIVE CLOSED
FAIRVIEW DRIVE US-395 FREEWAY CORRIDOR