By : Team 2 Evan Adamson & Brian Bathke. Project 2 The Proposal. The Scenario. Engineer with 10 years of experience and $100,000 has 2 options. Become a consultant for small time engineering firms. (Finds work 35% of the time for $150 dollars/hr)

caroun
Download Presentation

Project 2 The Proposal

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. By: Team 2 Evan Adamson & Brian Bathke Project 2 The Proposal

  2. The Scenario • Engineer with 10 years of experience and $100,000 has 2 options. • Become a consultant for small time engineering firms. (Finds work 35% of the time for $150 dollars/hr) • Open up a vehicle repair shop in the local mall for motorcycles, go-karts, dirt bikes, bicycles, etc. (Will be sold in 20 years)

  3. Assumptions for Consultant Job • Length = 20 years • Work = 35% • hours/week = 40 • Weeks/year = 18.2 • $/hr = $150 • yearly income = $109,200 • Inflation Rate = 3% • Income Tax = 30%

  4. Assumptions for Repair Shop • Total rent per year = $48,000 • Tools = $15,000 • Customers a Day = 5 • Open Days a week = 6 • Open weeks a year = 50 • Total customers = 1500 • Avg. price per customer = $65 • Income = $97,500 • Inflation = 3% • Tax = 35% • Total Company Cost = $45,000

  5. Comparison of Net Income over 20 Year Period • Consultant Job • Income=$2,934,245 • Cost=$2,707,459 • Net Earning=$226,786 • Plus Initial $100,000 • @ 5% rate=$265,000 • @ 9% rate=$560,000 • Total is $787,227 • Repair Shop • Income=$9,637,875 • Cost=$8,932,517 • Salvage is 5 times final years earnings • Salvage= $676,606 • Total w/ Salvage= $1,381,964 • Total w/o Salvage=$705,358

  6. Economic Analysis • Consultant Job • With 9% rate on Initial $100,000 • PV(3%,20yrs,$787227) • Present value of the Consultant Job is equal to $435,868. • With 5% rate on Initial $100,000 • PV(3%,20yrs,$492116) • Present value of the Consultant Job is equal to $272,473 • Repair Shop • With Salvage Value • PV(3%,20yrs,$1381964) • Present value of the Repair Shop is equal to $765,160. • Without Salvage Value • PV(3%,20yrs,$705358) • PV= $390,539

  7. Yearly Income Over Work Life For Consultant Job For Repair Shop

  8. Sensitivity Analysis-Yearly Cost For Consultant Job For Repair Shop

  9. Income Broken Down • Hours over 20 year period = 14,560 • Total Income/Total Hours • $54 per Hr. • Hours over 20 year period = 48,000 • Total Income/Total Hours • $29 per Hr.

  10. Conclusion • In conclusion the Repair shop produces more wealth but at a much higher risk. • Consultant Job along with well invested initial $100,000 produces a comfortable life. • Our choice is Consultant Job because of less hectic work schedule.