1 / 6

WP 2 WSP Sweden

WP 2 WSP Sweden. 0603/2013 | Project meeting 4 | Parma | Presented by: Fredrik Orwén. Reference group. Additional members Lukas Fojtik, PhD, CESMAD Bohemia Charlotta Nilsson, Sparcoach (Sweden) Still high interest inspite of low attendance Members. Reference group.

carr
Download Presentation

WP 2 WSP Sweden

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP 2 WSP Sweden 0603/2013 | Project meeting 4 | Parma | Presented by: Fredrik Orwén

  2. Reference group • Additional members • Lukas Fojtik, PhD, CESMAD Bohemia • Charlotta Nilsson, Sparcoach (Sweden) • Still high interest inspite of low attendance • Members

  3. Reference group • Juan Manuel FernándezEtxaniz, Grupo EVE, Spain • Robert Vaughan, Atmosphere and Local Environment Progr, UK • Paola Cossu, C-LIEGE Project, FIT Consulting, Italy • Tina Forsell, Alwex Transport AB, Sweden • Stefan Berg, Swedish Transport Administration, Sweden • Phil Flanders, Road Haulage Association, UK • Pamela Stott, Transport Scotland, UK • Enrico Bossa, FITA-CNA, Italy • Alberto Preti, ITL, Italy • Gordon Telling, Freight Transport Association, UK • EuskoTren, Spain • Magnus Gunnarsson, Swedish Haulage Association • Charlotta Nilsson, Sparcoach • Lukas Fojtik, PhD, CESMAD Bohemia

  4. Reference Group • Reference group report M24

  5. State-of-the-art • Finalised and presented

  6. Transferability • Ongoing process thatstartedwith the state-of-the-art report • Needto start a discussiontooutline the prerequisites • ECOSTARS 2?

More Related