NASA’s STEP for Aerospace Workshop • Using STEP for Engineering, Fabrication and Construction of Industrial Facilities • Mark Palmer • Computer Integrated Construction Group • National Institute of Standards and Technology • e-mail: mark.palmer@nist.gov • January 17, 2001
Agenda • Why develop information standards for the process plant industries? • STEP APs for process plant • Industry use of AP 227 • Extending AP 227 capabilities for other industries
Stakeholders in the Process Plant Industries • Process Industries includes: • chemical, gas processing, petrochemical, petroleum, pharmaceutical, power generation • food &beverage, pulp & paper, water & water processing • Process Plant Industries include: • owners/operators of process plants • engineering, procurement, and construction (EPC) companies • equipment and component suppliers • information technology suppliers
Equipment Vendors Production Design Pre-Project Planning Construction Construction Subcontractors Plant Operations & Maintenance Maintenance Contractors Process Plant Data Cycle ItsaRecycle Process ! MajorInterfaces Business Opportunities (R&D)
Need for Information Exchange Standards • Industry faces heterogeneous CAD/CAE environment -- in constant state of flux • Process plant typical life 25-50 years • CAE/CAD technology cycle 5-10 years • Technical information is reused over the life of the project, process, and plant • Large savings possible when engineering, procurement, construction, and operation can use diverse CAE/CAD and ERP systems • Standards enable these savings
What is a STEP Application Protocol? • AP: defines the usage of STEP for a defined application context • driven by industry information requirements • uses activity modeling, usage scenarios, and information modeling • specifies conformance requirements for testing implementations • Enables reliable information exchange
Management Activities Regulatory Bodies Produce and Maintain Financial Case Control Project Obtain Agreement with Regulatory Bodies Process Plant Industries Information Flows Produce Conceptual Process Design Decommission Plant Commission Plant Operate Plant Produce Detailed Process Design Produce Conceptual Engineering Design (Front End) Produce Detailed Engineering Design Construct Plant Pre-commission Maintain Plant and Equipment Demolish Plant and Restore Site Suppliers and Fabricators Procure and Control Equipment, Material and Services
Information Standards for the Process Plant Industries • Industry leaders exploiting IT and data exchange to improve project and plant performance • hindered by lack of effective exchange standards for process models, P&IDs, 3D plant models and life cycle information • Move to international standards and broader industry collaboration • PIEBASE - global coordination among industry consortia: ECOM, EPISTLE, pdXi, PISTEP, PlantEC, PlantSTEP, POSC, POSC/CAESAR, USPI-NL,… • Segments of the process plant industries are defining standards for sharing information • STEP application protocols and data warehouse capabilities
APs for the Process Plant Industries • AP 212, Electrotechnical Design and Installation • AP 221, Functional Data and their Schematic Representation for Process Plant • AP 227, Plant Spatial Configuration • AP 231, Process Design and Process Specifications of Major Equipment (cancelled)
AP 227 - Plant Spatial Configuration • Scope: 3D plant design • emphasis on spatial layout and piping design • includes physical and functional characteristics • developed by PlantSTEP and NIST • Status: • International Standard (IS) sent to ISO • Delivery of commercial implementations: • Dassault / IBM - CCPlant: IS implementation • Bentley - PlantSpace (MicroStation): 2001 • Cadcentre - PDMS: in development • Intergraph - participating in ESTEP AP 227 project • STEP Tools - AP 227 viewer • Merck requirement for CAD/CAE systems and pilot project • AP 227 requirement for plant CAD/CAE purchases • Navy requirement for delivery of piping systems data • NASA requirement for plant CAD/CAE purchases
Scope of AP 227- Plant Spatial Configuration Management Activities Regulatory Bodies Produce and Maintain Financial Case Control Project Obtain Agreement with Regulatory Bodies Produce Conceptual Process Design Decommission Plant Commission Plant Operate Plant Produce Detailed Process Design AP 227 Produce Conceptual Engineering Design (Front End) Produce Detailed Engineering Design Construct Plant Pre-commission Maintain Plant and Equipment Demolish Plant and Restore Site AP 227 - Plant Design Suppliers and Fabricators Procure and Control Equipment, Material and Services Note: Limited capabilities provided for constructing and maintaining plant.
Usage Scenarios for AP 227 Edition 1 • Exchange of piping components and equipment designs • Exchange of piping assemblies and systems spatial layout, with references to catalogs • Exchange of interference analysis results • Exchange of changes to piping systems and plant layout • Exchange of piping installation information • Exchange of modules of plant designs • Exchange of as built plant configurations
Broader Industry Adoption of AP 227 • After successes in process plant, U.S. Navy and shipbuilding companies adopted AP 227 • assessed AP 227 and determined sufficient foundation • funding a Ship Piping Guide for AP 227 • U.S. MARITECH Shipbuilding Program • ESTEP project is working on AP 227 edition 2 • add more information for HVAC, pipe flow analysis, hanger and support details, catalog referencing, PMI • More commercial implementations in 2001 • Other companies are making AP 227 a requirement for CAD/CAE system purchases and a tool for improving project delivery and information re-use
Extending AP 227 for Greater Benefits • Edition 2 project to extend AP 227 capabilities • process plant, piping fabricators and shipbuilding • Piping shop fabrication and inspection • Piping installation • HVAC design and installation • Input for pipe and HVAC flow / stress analyses • Support and hanger details • Cableway spatial design and installation • Positive material identification • Ship unique information
Scope of AP 227 - Extensions for 2nd Edition Management Activities Regulatory Bodies Produce and Maintain Financial Case Control Project Obtain Agreement with Regulatory Bodies Produce Conceptual Process Design Decommission Plant Commission Plant Operate Plant Produce Detailed Process Design AP 227 ed2 Produce Conceptual Engineering Design (Front End) Produce Detailed Engineering Design Construct Plant Pre-commission Maintain Plant and Equipment Demolish Plant and Restore Site AP 227 ed1 - Plant Design Suppliers and Fabricators Procure and Control Equipment, Material and Services AP 227 ed2 - piping / equipment fabrication
t s t s Isometrics and Spool Drawings 3D CADD System Pipe Fabricator Construction Site Current Pipe Fabrication Process -Drawing based, data re-entry, minimal CNC,paper trail for inspection, testing & delivery Isometric/Spool Drawing Systems Pipe Spools
Activities – Piping Fabrication Phase Prepare Fabrication Piping Inspect Fabricated Piping Ship Fabricated Piping Fabricate Piping Cut Piping Bend Piping Edge Preparation Primary Weld Secondary Weld
t s Future Pipe Delivery Work Process: Reduced need for drawings, reuse of 3D model, improved CNC, inspection,delivery, installation 3D model with spool and weld data t s or STEPAP 227 Files Isometric and Spool Drawing Systems 3D CADD System Piping spool, weld and inspection data Pipe Fabricator Construction Site Pipe Spools
Conformance Classes for AP 227 ed2 • Include in ed1 and ed2 • CC1: piping system functional information • CC2: equipment and piping spatial information • CC3: plant spatial configuration information • CC4: piping fabrication information • Additions to ed2 • CC5: piping inspection information • CC6: HVAC system functional information • CC7: HVAC spatial configuration information • CC8: cableway spatial configuration information • CC9: HVAC and piping flow analysis input
Summary • AP 227 is a proven solution for improving the design and construction of process plants • Other industries are adopting AP 227 • Industry and NIST are working on extending the capabilities of AP 227 • Time for broader adoption by industry • process plant, industrial facilities, shipbuilding, • aerospace facilities • Requires: • Industry demand for AP 227 interfaces with CAD/CAE, CAM and CIC systems • Industry requirement for purchases of CAx systems