60 likes | 278 Views
Test beam preparation. 20/9/19 35 th FCAL workshop DESY, Hamburg. HW preparation. Tungsten plates ready (thanks to Eva/Konrad) 21 sensors ready (not all tested with muons)
E N D
Test beam preparation 20/9/19 35th FCAL workshop DESY, Hamburg
HW preparation • Tungsten plates ready (thanks to Eva/Konrad) • 21 sensors ready (not all tested with muons) • Charge divider (CD) : ready, just need to define one component (capacitance). APV arrived to Hans for modifications (test with sensor ?) • Readout APV • Equip half sensor for each layer • Layer 1 to 3 : no CD, one APV • Layer 4 to 14 : CD, two APV • Layer 15 to 20 : no CD, one APV • APV DAQ : 3 DAQ cards. Clock distribution card missing • Readout FLAME : will be ready to equip one or two planes. Agreed on connectors. Will send one sensor.
What shoud arrived at DESY the week before the TB • FCAL box (frame, tungsten planes,…) • Sensors • Electronics (APV, crate,…) • Computers • cables
manpower • Sergej • Wolfgang Klempt (?) • Hans • Jakub • Veta • Sacha • Itamar • Meny • Yan • Student from VINCA • Student from JINR • Students from Tomsk (?) • Student from TAU(?) Meny Yan Safety course Test beam NO POSSIBILITY TO HAVE ONLY ONE SHIFTER : 2 OR NOTHING