100 likes | 201 Views
E nabling N ext G enerat I on Ne tworks for broadcast S ervices. TF.12 “ T2-Lite ” Field Trials Validation Plan PCC10 12-13.06.2012. TF.12 “T 2-Lite ” Field Trials PCC10 12-13.06.2012. FIELD TRIALS GOALS Validation of TF10 prototypes in real scenarios.
E N D
Enabling Next GeneratIon Networks for broadcast Services TF.12 “T2-Lite” Field Trials Validation Plan PCC10 12-13.06.2012
TF.12 “T2-Lite” Field Trials PCC10 12-13.06.2012 FIELD TRIALS GOALS • Validation of TF10 prototypes in real scenarios. • Test T2-Lite performance in mobility. • Test T2-Base and T2-Lite mixed mode. • Test SFN Performance ??? • Test MISO Performance ??? • Not supported by UPV/EHU receiver. • Signals can be recorded for off-line lab measurements is receivers available.
TF.12 “T2-Lite” Field Trials PCC10 12-13.06.2012 WHERE • Barcelona. Abertis Network. • Frequency: • Channel 22 (482 MHz). • MainTransmitter • Collserolla. • Power: 350 watt. • Second Transmitter • Abertis building C roof • Power: 20 watt. • SFN network and MISO measurements
TF.12 “T2-Lite” Field Trials PCC10 12-13.06.2012 DISCUSSION Confirm equipment Confirm Tests: Modes and methodology => Schedule Confirm Date
TF.12 “T2-Lite” Field Trials PCC10 12-13.06.2012 DISCUSSION Confirm Equipment Equipment Provider Equipment • Abertis Telecom • ENENSYS • La Salle University • MIER Comunicaciones • SONY • Teamcast • Thomson- Broadcast • UPV-EHU Network Modulator and Gateway Gateway Transmitter Demodulator Modulator Modulator and Transmitter Demodulator and Reception System
TF.12 “T2-Lite” Field Trials PCC10 12-13.06.2012 DISCUSSION Confirm Tests: Modes and methodology => Schedule • Mode 1: Mixedmode(Measured in TF11) • Test mobilereception of T2-Lite and T2 base in mixed. • Mode 2: 3 PLPswithdifferentcode-rate & subslicing • Performance test of T2-Lite modeswith new code-rates. • 3 PLPs with different code-rate (1/2, 1/3, 2/5) • Studytheeffect of subslicingonsignalreception. • Mode 3: 3 PLPswithdifferentinterleaving(Measured in TF11) • Test theinfluence of time interleaving. No subslicing. • 3 PLPs with different interleaving (16.67ms, 33.33ms, 43.74ms)
TF.12 “T2-Lite” Field Trials PCC10 12-13.06.2012
TF.12 “T2-Lite” Field Trials PCC10 12-13.06.2012 DISCUSSION Confirm Tests: Modes and methodology => Schedule Methodology & Schedule • 1 week : (same as lab tests) • - set-up & on-line measurements to validate routes with good reception • 2-3 weeks: • Record receivedsignalwith 3 modes in MFN, SFN & MISO • 7 weeks: • Off-line measurements in the laboratory based on the IQ samples files previously recorded. Expected results • Validate T2-Lite and Mixed mode reception (On-line & Off-line) • Time coverage percentage (Off-line) • - Using UPV/EHU receiver • - Influence of T2-Lite parameters (Code rate, Time interleaving, Subslicing) • - SFN & MISO results ?
TF.12 “T2-Lite” Field Trials PCC10 12-13.06.2012 DISCUSSION Confirm Date (week 38 & weeks 39-40-41) PCC 12 - TURKU ºº w38: set-up & on line measurements w39-40-41: signal recording Results
TF.12 “T2-Lite” Field Trials PCC10 12-13.06.2012 Department of Communications Engineering University of the Basque Country - UPV/EHU Alameda Urquijo s/n 48013 Bilbao +34 94 601 4123 / +34 689 998 017 +34 94 601 4259 manuel.velez@ehu.es UPV/EHU participates in ENGINES project, TSI-020400-2010-108, supported by Spanish Minister of Industry, Tourism and Trade. UPV/EHU participates in ENGINES project under Celtic Initiative (Celtic Label CP7-005)