Climate Resilient Flood Management in Urban Assam

This project aims to develop climate resilient flood management action plans for four cities in Assam - Silchar, Dibrugarh, Majuli, and Jorhat. It includes HRVA analysis, infrastructure measures, forecasting and warning systems, capacity building, and implementation guidance.

cashford
Download Presentation

Climate Resilient Flood Management in Urban Assam

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Climate Resilient Flood Management In Urban Assam Rizwan Uz Zaman State Team Leader - (Assam) ACTION ON CLIMATE TODAY - Climate Change Innovation Programme (CCIP) March 2019 | Bangkok

  2. Project Objectives

  3. Project Phases

  4. Methodology City selection: Dibrugarh, Majuli, Jorhat, Silchar Shared learning dialogues Collaborative Sharing and not extracting HRVA analysis: quantitative survey to capture the HRVA

  5. City specific analysis

  6. City specific analysis - Dibrugarh HRVA - Dibrugarh Scale Map of Dibrugarh HRVA - Majuli Scale

  7. City specific analysis - Silchar HRVA - Silchar Scale Map of Silchar

  8. City specific analysis - Jorhat HRVA - Jorhat Map of Jorhat Scale

  9. Flood Risk Infrastructure Flood Risk Flood risk includes both the chance of an event taking place and its potential impact Flood risk is harder to manage in existing developed areas; however modification measures such as dams or levees can change the behaviour of floodwaters. • Chance of a flood • Consequences of a flood • Exposure to flood waters • Vulnerability due to flood waters FLOOD MITIGATION AND RISK TRANSFER MEASURES FOR INFRASTRUCTURE Structural Levees Floodwalls Seawalls Dams Floodways & spillways Channels Controlled overtopping Levee armouring Seepage control Non-Structural Natural systems Risk mapping Hazard forecasting, early warning systems, & emergency plans Flood Insurance Dry and wet floodproofing Land-use planning and zoning Construction standards and building codes Acquisition and relocation Map of Jorhat

  10. Learning & Broad Recommendations- Structural Measures Maintaining reservoirs, flood protection systems Augment storm water drainage network Strengthening critical infrastructure Regulate environmental flows Road re-layering improvements

  11. Learning & Broad Recommendations- Planning & Policy INTEGRATE

  12. Learning and Broad Recommendations- Forecasting and warning Learning & Broad Recommendations- Forecasting and warning • Strengthening existing flood forecasting systems • Installing Doppler radar in the state • Automatic weather stations along the rivers and tributaries • Data and its analysis to be shared with departments heads in cities

  13. Learning & Broad Recommendations- Capacity Building Training departments to prepare and implement department's flood contingency plans and SoPs Build capacities of officials to establish a command and hierarchy system to collect, analyse and disseminate early warning data Identification of nodal person in each department responsible for disaster management activities Refresher courses for updating skills and knowledge, flood rescue management at department and community level

  14. Outputs of the Actions A policy paper, detailed report with city specific findings and climate resilient flood management action plans

  15. Actions adopted 5 key projects have been recommended that will have the bearing on the State Governments to implement. • Project 1: Development of catchment area of Barak • Project 2: Conservation of water bodies • Project 3: Enhancing revenue of ULB through property tax reforms and fees for basic services • Project 4: Review of CPHEEO (design and O & M) manuals for water supply • Project 5: Developing and implementing SoPsfor assessing impacts of Urban Flooding/ waterlogging

  16. Way forward • The actions proposed in the project were refined in order to make them effective for implementation. • Stakeholders from Cities, State Government and other relevant departments were consulted to validate the action plans and establish investment requirement, time requirement and institutional responsibility for implementation of the actionsproposed • Preparation of implementation guidance document & city specific knowledge productsto facilitate cross learning and dissemination plan adopted • Identification of state-level projects for cohesive action towards urban flooding into the plans of different department

  17. THANK YOU Rizwan Uz Zaman State Team Leader(Assam) - ACTION ON CLIMATE TODAY (ACT) Climate Change Innovation Programme (CCIP) Mob- +91- 9999109757 | E-mail: rizwan.zaman@actiononclimate.today

  18. About the project About the project Part of the larger multi-country ‘Action For Climate Today (ACT) programfunded by DFID Government Partner: Assam State Disaster Management Authority, Government of Assam Main theme: Climate resilient flood management action plans for 4 cities in Assam that include –Silchar, Dibrugarh, Majuli, and Jorhat

  19. Phase - 2 OBJECTIVE • The overall purpose of Phase - 2 of the project is to create enabling environment for uptake of the city flood management action plans which would be done by detailing the following aspects and training the ULB and urban planners to adopt these, along with providing recommendations for state-level projects: • Qualitative assessment of cost and benefits of the recommendations • Develop an Implementation Guidance for Flood Management Action Plan • City level Capacity Building on the Implementation guidance • Support stakeholder departments in establishing linkages with the donor agencies like WB, ADB to support implementation