Managing Subcontracting in Advanced Repetitive. MWUG 2013 Grand Rapids, MI. Why Subcontract?. Subcontract Triangle. Supplier Schedule (PO). PO and Line. WO ID. OP. Routing. Cumulative Work Order. Routing Code. Process Flows. Normal Scenarios. #1 - Permanent. #2 - Temporary.
E N D
Managing Subcontracting in Advanced Repetitive MWUG 2013 Grand Rapids, MI
Subcontract Triangle Supplier Schedule (PO) PO and Line WO ID OP Routing Cumulative Work Order Routing Code Process Flows
Normal Scenarios #1 - Permanent #2 - Temporary
#1 Permanent RM Release Plant Steel mill RM delivered WIP Release Sub-Contractor • Receipt acknowledgment • PO Receipt (special location) • WIP Shipped / Invoiced • PO Receipt (WIP) with backflush
#2 Temporary Plant Shipped Blank made Sub-Contractor Formed item made • Receipt acknowledgment • Inventory transfer • WIP Shipped / Invoiced • PO Receipt (WIP) with backflush
PO Receipt RCT-WO and ISS-SO do not complete due to lot/serial control
Backflush Transaction Follow-up receipt with modified backflush to report and issue lot specified components