Oswego Riverbank Stabilization C&S ENGINEERS, INC
Pre-construction condition Oswego Riverbank Stabilization
Soil/Rock interface at river’s edge Oswego Riverbank Stabilization
Pre-construction condition: concrete fill Oswego Riverbank Stabilization
Pre-construction: Salmon anglers Oswego Riverbank Stabilization
Hayward Baker 2’ Diameter Auger Oswego Riverbank Stabilization
Hayward Bayer auger and casing for rock sockets Oswego Riverbank Stabilization
Augered rock socket for soldier pile Oswego Riverbank Stabilization
Cores from rock sockets Oswego Riverbank Stabilization
Concrete placement to anchor soldier piles Oswego Riverbank Stabilization
Installation of lagging panels Oswego Riverbank Stabilization
Soldier piles and lagging panels Oswego Riverbank Stabilization
Hayward Baker drilling for rock anchor tiebacks Oswego Riverbank Stabilization
Tieback Anchor Drilling Oswego Riverbank Stabilization
1.25” diameter rock anchors Oswego Riverbank Stabilization
Completed wall Oswego Riverbank Stabilization
Completed wall Oswego Riverbank Stabilization
Looking northwest over Varick Dam Oswego Riverbank Stabilization
Sidewalk, capbeam, railing, and protective screening Oswego Riverbank Stabilization