280 likes | 374 Views
Professionalism in Project Control Howard Malleson The Assessment Service Centre of ACostE. Projects are enterprises or activities that:- Bring about, or result from, change. Have defined goals and objectives. Create business opportunities. Contain elements of uncertainty and risk.
E N D
Professionalism in Project Control Howard Malleson The Assessment Service Centre of ACostE
Projects • are enterprises or activities that:- • Bring about, or result from, change. • Have defined goals and objectives. • Create business opportunities. • Contain elements of uncertainty and risk.
“The key purpose of those engaged in project control occupations is to develop and provide professional estimating, cost control, planning and commercial support to the successful implementation of projects”
Projects • are enterprises or activities that:- • Bring about, or result from, change. • Have defined goals and objectives. • Create business opportunities. • Contain elements of uncertainty and risk. Project Control Planning Estimating Cost Engineering Commercial Support
Using technicalskills • Using information technology • Risk identification, analysis, monitoring and control • Estimating resource requirements • Assuring and controlling the quality of project control • Controlling project documentation • Acquiring, interpreting and using data and information
51 Occupational Standards 346 specifications of what you must be able to do Project Control Body Of Competence 408 specifications of what you must know Level 3 – 17 Standards Level 4 – 35 Standards
Unit – Oversee the application of IT to project control Context • The collection and processing of project control data. • Reporting project current status • Predicting future status • Application of software and hardware as a competent user, not an IT specialist
Unit – Oversee the application of IT to project control You must be able to: • Make recommendations about the choice and use of software and systems • Extract, enter, edit and process information • Structure and create reports to meet project needs • Share your skills and understanding • Improve the effectiveness of IT application • Recommend and implement security measures
Unit – Oversee the application of IT to project control You must know: • About the attributes of available IT tools • How to select and customise IT tools • About the operational needs of the project control IT systems • Sources and flow paths of project control data • About data security systems • About data system interfaces within your own and with external organisations
To download the National Occupational Standards and the details of the National Vocational Qualifications: Go to www.acoste.org.uk
Using The Standards • Achievement of formal qualifications • Creation of training and development programmes • Bench marking • Recognition of personal and professional growth and capabilities
Assessment structure Awarding Body External Verification Approved Centre TASC Internal Verification Assessors Candidates
The Assessment Process • identify opportunities which generate evidence • assess evidence of competent performance • assess knowledge • match performance and knowledge evidence against scope requirements • analyse evidence • collate evidence in a portfolio
Candidate Profile • Candidate 4 • Early 40s, outgoing and personable • HNC (Mech) and apprenticeship • Planning and site experience • Lead Planning Engineer on proposals • Since NVQ level 4: • Top Strategic Planner in company • Working with Strategic Lead Team • Has gained real confidence as a consequence • Is a big believer in NVQs
Candidate Profile • Candidate 2 • Late 20s, low career aspiration/enjoyed work • Site Office Technical Assistant background • Very capable at grade • Started on Level 3 • Since NVQ Level 4: • Worked in Planning Risk and Estimating • Willing to be the “Project Acupuncturist” • Now Project Control Manager • Considered one of the ‘High Fliers’
National and International Recognition • National Vocational Qualifications at Levels 3 and 4 awarded by ECITB • Matching with Engineering Council UK Spec as a basis for CEng, IEng and Eng Tech through ACostE • The Standards and qualifications ‘hosted’ on the ICEC website • Certified Cost Engineer from the International Cost Engineering Council (ICEC) through ACostE based on the NVQ • Corporate and graduate membership of ACostE – MACostE and GMACostE
The National Qualifications And Professional Excellence Develop and demonstrate the ability to DO plus Develop and demonstrate depth and breadth of KNOWLEDGE Proven Competence and Professional Excellence
Future Developments • Improving intake into the profession • Bench marking to improve team • management • Extending professional standing and • recognition
Structured Alternative Intakes Into The Profession Of Project Control GCSE/A level entrants to apprenticeships Experienced craft/technician or HNC/HND or graduate entrant to apprenticeship/graduate training scheme College based basic technician training – key skills, project control elements & F.E. Off the job bridging courses including key skills, technology, project control elements and F.E./H.E. – tailored to individual needs • Company defined on the job coached basic introduction to project control including: • Estimating, planning, purchasing, cost engineering, risk, QA, change control etc • Provided by a mix of off site (training establishment or college) and on site New Foundation Level NVQ in Project Control (Level 2) Existing Intermediate Level NVQ in Project Control (Level 3) In company job related coached project control experience
Benchmarking Process Candidate completes the Experience and Knowledge Self Assessment Review, initial rating and interview preparation by Assessor Interview by Assessor – 30 to 40 minutes. Adjust initial ratings Prepare and issue report
Benchmarking Responses by the candidate will be accorded one of five ratings 0 – No knowledge 1 – Aware of the activity but little practical knowledge or experience 2 – Competent to deliver at Intermediate level 3 – Competent to deliver at Professional level 4 – Recognised expert can supervise others and advise clients.
ACostE – Building The Arch of Professionalism The Pillar of Knowledge The Pillar of Experience The Key Stone of Competence