1 / 4

PCE Working Group Meeting IETF-72, July 2008, Dublin

PCE Working Group Meeting IETF-72, July 2008, Dublin. Online Agenda and Slides at: https://datatracker.ietf.org/cgi-bin/wg/wg_proceedings.cgi Co-chairs: JP Vasseur/Adrian Farrel ADs: Ross Callon/Dave Ward. Administrivia (Chairs) 5 minutes (5/150) WG status (Chairs) 15 minutes (20/150)

Download Presentation

PCE Working Group Meeting IETF-72, July 2008, Dublin

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PCE Working Group MeetingIETF-72, July 2008, Dublin Online Agenda and Slides at: https://datatracker.ietf.org/cgi-bin/wg/wg_proceedings.cgi Co-chairs: JP Vasseur/Adrian Farrel ADs: Ross Callon/Dave Ward 72th IETF, Dublin, July 2008

  2. Administrivia (Chairs) 5 minutes (5/150) • WG status (Chairs) 15 minutes (20/150) • Inter-layer Framework and Requirements: Tomonori Takeda and Adrian Farrel 10 minutes(30/150) • draft-ietf-pce-inter-layer-frwk-07.txt • draft-ietf-pce-inter-layer-req-07.txt • Inter-layer PCEP extensions: Tomonori Takeda 10 minutes (40/150) • draft-ietf-pce-inter-layer-ext-01.txt • PCE application to GMPLS: Tomohiro Otani 10 minutes (50/150) • draft-otani-pce-gmpls-aps-req-02.txt • P2MP PCEP Applicability Requirements: Tomonori Takeda and Adrian Farrel10 minutes (60/150) • draft-yasukawa-pce-p2mp-app-02.txt • draft-yasukawa-pce-p2mp-req-05.txt • P2MP PCEP extensions: Fabien Verhaeghe 15 minutes (75/150) • draft-zhao-pcep-p2mp-extension-00.txt • Global Concurrent Optimization: Young Lee 10 minutes (85/150) • draft-ietf-pce-global-concurrent-optimization-04.txt • SVEC List For Synchronized Dependent Computations: Itaru Nishioka 10 minutes (95/150) • draft-nishioka-pce-sve-list-02.txt • Performance Evaluation of PCE for WSON: Greg Bernstein 10 minutes (105/150) • draft-bernstein-pce-WSON-evaluation-00.txt • PCEP Requirements and Extensions for WSON: Young Lee 10 minutes (115/150) • draft-lee-pce-wson-routing-wavelength-02.txt • Vendor Constraints: Adrian Farrel 10 minutes (125/150) • draft-farrel-pce-vendor-constraints-01.txt • Applicability of PCE to VPNs: Adrian Farrel 5 minutes (130/150) • draft-yasukawa-pce-vpn-req-04.txt • PCEP Extensions for L3VPNs: Kenji Kumaki 10 minutes (140/150) • draft-kumaki-murai-pce-pcep-extension-l3vpn-00.txt • Discovering PCEs in other ASes: Kenji Kumaki10 minutes (150/150) • draft-kumaki-pce-bgp-disco-attribute-01.txt Agenda - PCE Working Group Meeting - IETF-72 - Dublin - July 2008

  3. PCE WG Rechartered Done Submit first draft of PCE architecture document Done Submit first draft of PCE discovery requirements and protocol extensions documents Done Submit first draft of the PCE communication protocol requirements Done Submit first draft of the definition of objective metrics Done Submit first draft of the PCE communication protocol specification Done Submit PCE architecture specification to the IESG to be considered as Informational RFC Done Submit first draft of the MIB module for the PCE protocol Done Submit PCE communication protocol requirements to the IESG to be considered as an Informational RFC Done Submit PCE discovery protocol extensions specifications to the IESG to be considered as a Proposed Std Done Submit PCE communication protocol specification to the IESG to be considered as a Proposed Standard Jun 2008 Submit first draft of applicability statement (describing the processes and procedures for the use of the PCE architecture, protocols and protocol extensions for inter-area MPLS and GMPLS Traffic Engineering) Jun 2008 Submit first draft of the PCE P2MP communication requirements Jul 2008 Submit first draft of the PCE P2MP PCEP protocol extensions Sep 2008 Submit PCE P2MP communication requirements to the IESG to be considered as an Informational RFC Nov 2008 Submit applicability statement to the IESG as informational RFC Dec 2008 Submit PCE P2MP PCEP protocol extensions to the IESG to be considered as an Proposed Std RFC Feb 2009 Submit applicability and metrics documents to the IESG Feb 2009 Submit the PCE MIB Internet-Draft to the IESG for consideration as Proposed Standard Feb 2009 Evaluate WG progress, recharter or close 72th IETF, Dublin, July 2008

  4. Working Group Update • BRPC on RFC Ed Queue (JP) • PCEP status (JP) in revised ID needed • Path Key (JP): in publication request • Policy enabled path comp (Lou/Igor) in revised ID needed • XRO (Adrian) in IESG evaluation : AD follow-up • Inter-AS requirements (Adrian) in IESG LC • MIB progress (Emile/Kiran/Adrian) • PCEP DSTE status (Siva/Kenji) • PCEP Objective Functions status (Jean-Louis/JP) Stable – ready for LC • PCE monitoring tools status (JP) Stable – ready for LC 72th IETF, Dublin, July 2008

More Related