An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AOP version E Science Operations For the ASAC meeting March 9-10, 2010 Lars-Ake Nyman 1

  2. AOP version E Baseline: • DSO staff changes • Cost for the Proposal Review Process • Reduced number of array configurations Possible future scenarios: • Reduced science operations during the Altiplanic winter • Reduced number of archives 2

  3. DSO AOP version D: • 13 DSO astronomers, 9 fellows, 4 AoD shifts/day, assumption that ACA may have to be operated separately • AOP version E: • Replace the fellows (ISM) with Data Analysts (LSMs) • Assume that ACA and the 12m-array can be operated simultaneously by one person (3 shifts/day). Replace 2 AoD shifts/day by Data Analysts and ARC astronomers (assume that the Data Analysts are always supervised by an astronomer) • Can be done with 9 DSO astronomers and 6 Data Analysts Cost savings: 950 kUSD/year AOP version D AOP version E AoD 8h AoD 12h AoD 8h AoD 12h AoD 8h AoD => DA, ARC ACA support: AoD 3

  4. Department of Science Operations Department of Science Operations Head of Science Operations 2 Administrative Assistants (OSF) +1 Adm Asst (SCO) Proposal Handling Team 1 Astronomer (lead) (+1) 1 Adm assistant (+1) 1 IT person (+1) Program Management Group 2 Managers 9 Astronomers (-4) 6 Data Analysts (-9 fellows) 1 Web staff (-1 web content Manager) Array Operations Group 2 Managers 10 Operators Data Management Group 2 Managers (Astronomers) 6 Archive Operators/Content Managers (OSF) 6 Archive Operators/Content Managers (SCO) 4 System Astronomers • Observations • Quality assurance • PRC support • Web pages • Array operations • Archive and pipeline • operations • Quality assurance 4

  5. Costs for the Proposal Review process • One proposal cycle/year • Proposal Handling Team (PHT) included in the DSO (1 Lead Astronomer, 1 Adm Asst, 1 IT staff) • Assumptions for ARP and APRC meetings: • There are 8 ARPs each with 9 members. Of the 9 members 6 are traveling to an ARC for f2f meeting, the other 3 non-traveling members provide ranks and science assessments • The APRC (9 members) meet f2f in Santiago • Cost savings: 670 kUSD/year 5

  6. Reduced number of array reconfigurations • 8 configurations moving out and a different set of 8 configurations moving in • Stay for 1-2 weeks in each configuration • ACA reconfigurations as before • Two transporter crews are needed (compared to 4 in version D) • Effects on imaging is being studied (the effects are minor) by Baltasar Vila Vilaro and the regional PSs. A memo will be produced Cost savings: two transporter crews 6

  7. Future possibility: reduced science operations during the Altiplanic winter • Operations of ACA and short baselines of the 12m array during February and March • We are investigating whether maintenance and overhauls can be done preferably in this period, in order to make operations more efficient during the rest of the year • We will not implement this scenario 7

  8. Future Possibility: No ARC mirror archives Baseline plan: 5 Archives (OSF, SCO, ARCs) Scenario: No ARC mirror archives. OSF archive will act as backup. SCO archive will deliver data to PI:s will be the ALMA Science Archive Cost increases: • Double the OSF archive upgrade budget. • Add costs for physical media • Additional SCO server and license for higher reliability and to keep up with the load • Add cost for 1 Gbit/s link for archive users between Santiago and the US (or Europe or Japan) Staff increases: • 1 delivery administrator at SCO (LSM) • 2 database administrators (DTS) (LSM) • 1 software engineer (DTS) (LSM) • 2 Database Base Content Managers (LSM) 8