An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Disaster Recovery - After 72 Hours - Jim LaMorte Smart Risk Control, Inc. jlamorte@telus.net

  2. Canterbury NZ Earthquake - 2010

  3. Canterbury EQ – Sept 2010 • No fatalities • Roads damaged • Power out to 75% of Christchurch • Water pipes broke where liquefaction • Sewer system out in some places for 6 weeks • 40,000 of 160,000 buildings need repair • More than 500 homes must be rebuilt • Thousands of properties must be re-surveyed

  4. Christchurch Earthquake - 2011

  5. Christchurch EQ – Feb 2011 • 172+ Fatalities • Central Business District still closed • 100,000 homes damaged; 10,000 require demolition • 450 mobile homes on sites across city • Plan for 500 modular homes • Some areas may be abandoned due to land damage • Residents offered relocation under insurance

  6. Comprehensive Emergency Management Level of Effort Event BusinessContinuity Business as Usual Short-Term Recovery Response Local GovRecovery Preparedness AssessRisks Community Recovery Mitigation Time

  7. Physical Effects • Damage to Buildings • Loss of infrastructure • Altered landscapes • Environmental contamination

  8. Social Effects • Stress • Focus on short-term family objectives • Delay of community social programs • Widening gaps in economic classes

  9. Economic Effects • Loss of businesses • Loss of jobs • Reduced cash flow • Ripple effects

  10. Community Recovery Defined • Coordinated actions to limit losses, reduce suffering, and restore the psycho-social and economic viability of the community.

  11. What Are the Recovery Objectives? • Return things as they were? = return to risks • Help those in need? = Needs differ • Assist in rebuilding? = Some move away • Support local authority? = Tax base

  12. Short-Term Recovery • Allow those affected access to their homes and businesses • Facilitate salvage • Remove debris • Encourage those affected to tell their stories • Quickly provide some infrastructure • Support local businesses

  13. No Single Organization Can Do it All • Not those affected • Not those unaffected • Not the local govt • Not the province • Not the NGOs • Not the businesses • Not the institutions It takes them all

  14. Volunteers in Recovery • Disasters generate an outpouring of altruism • Volunteers can significantly influence the timeliness and success of recovery • Able to provide services that organizations cannot • They will come, so we better be ready

  15. Management of Volunteers • Neighbours helping neighbours can build strong community bonds • Unless volunteers are properly managed, they can complicate recovery efforts. • Volunteer management should be assigned to skilled recovery staff

  16. Volunteers in State of Florida • 3,100 vols helped clean up over several weeks • Estimate for professional cleanup: = $8 million • The actual cost:= $1.4 million due to volunteers • Volunteers shortened cleanup time from 90 days to about 55 days Florida Tornado, 1998

  17. University of Canterbury, 2011

  18. ジャパン・タイムズ取材の関連記事 Japan EQ-Tsunami, 2011 Japan Cat Network is a registered non-profit organization dedicated to trap, neuter and return (TNR) as a means of helping Japan’s stray and abandoned cat population.

  19. Japan EQ-Tsunami, 2011

  20. Volunteers Can Help With Short-Term Recovery… • Animal Care • Child Care • Communication • Damage Assessment • Debris Removal • Elder Care • Housing, Temporary • International Services • Mobile Feeding • Sanitation Services • Stress Relief • Spiritual Care • Translation • Transportation • Warehousing

  21. Activity: Think Tank • Discuss the Questions on Short-Term Recovery for Your Table • You will have 30 minutes • Select a Spokesperson • Will have 3 minutes to summarize key points

  22. Group Assignments for Think Tank Podium Topics1-A Topics1-B Topics1-C Topics1-A Topics1-B Topics1-C Topics1-D Topics1-D

  23. Thank You! Send comments to: Jim LaMorte jlamorte@telus.net

  24. Disaster Recovery - After 72 Hours - Jim LaMorte Smart Risk Control, Inc. jlamorte@telus.net

  25. Kobe Earthquake - 1995

  26. Okanagan Mtn. Park Fire – Kelowna 2003

  27. Katrina, New Orleans - 2005

  28. Chile Earthquake - 2010

  29. Japan Tsunami - 2011

  30. Comprehensive Emergency Management Level of Effort Event Business as Usual Business Continuity Long-Term Recovery Response Local GovRecovery Preparedness Assess Risks Community Recovery Mitigation Time

  31. Long-Term Recovery • Reconstruct, replace homes, businesses and infrastructure • Support those who decide to move elsewhere • Build Back Better • Mitigate Hazards – Land use • Enhance Environmental Quality • Secure Energy Sources • Enhance Local Economic Vitality • Enhance Community Quality of Life • Promote local economy

  32. Individual Ability to Recover Differs Individual, family, and community recovery is influenced by social and economic conditions.

  33. Volunteers Can Help With Long-Term Recovery… • Advocacy • Child Care • Communication • Construction, Repair • Elder Care • Funds Management • Goods Management • Housing Relocation • Legal Services • Mass Care Long Term • Mitigation Planning • Mobile Feeding • Rebuilding • Spiritual Care • Training • Transportation

  34. Volunteers in New Orleans - 2011 • Volunteer Projects Still Underway 5 years after Katrina • Reconstruction of homes • Sports fields for schools • Park landscaping • Tool Lending Library

  35. Canberra Wildfire - 2003 • “…Volunteering helped community members transform their feelings of being victims into ones of empowerment, thereby creating a positive basis for long term recovery.”

  36. Florida State Volunteer opportunities • Coastline watchers • Pre-oil landfall beach cleanup • Local bird survey • Beach and wildlife monitoring • Seabird rehabilitation BP Oil Spill, 2010

  37. Fairfax County, Virginia • Volunteer Mobilization Team – To Organize and Deploy Volunteers • Clear debris • Distribute water and blankets • Answer county hotline phones • Distribute food and water • Serve as a project coordinator • Assist case management agencies

  38. Mitigation may be defined as... Actions taken before the next disaster to automatically reduce: • The chance of damage, and/or • The adverse consequences Could be called Prevention, Loss Reduction, Risk Management, other…

  39. Mitigation Windows • During Initial Construction • During Planned Reconstruction • Retrofitting for Mitigation • Reconstruction Following Disaster (Recovery Phase)

  40. Hurricane Protection - Florida • Students helped elderly residents by installing hurricane shutters, roof protection • Local business partners included Home Depot and Southeast Metal Corp., provided instruction and materials

  41. Flood Mitigation - Maryland • Local Government and many private-sector organizations such as American Trust Bank, CSX Transportation, Lowe's Home Center • Volunteers and professional contractors raised major appliances to prevent damage from floods • In the homes of elderly and low-income residents of the county.

  42. Earthquake Protection – Oakland • Students spent Spring Break helping residents in 300 housing units • Weather-proofed doors and windows • Strapped water heaters to walls • Secured heavy objects so they would not block exits or cause injuries • Business partners included Home Depot

  43. Activity: Think Tank • Discuss the Questions on Long-Term Recovery for Your Table • You will have 30 minutes • Select a Spokesperson • Will have 3 minutes to summarize key points

  44. Group Assignments for Think Tank Podium Topics2-A Topics2-B Topics2-C Topics2-A Topics2-B Topics2-C Topics2-D Topics2-D

  45. Thank You! Send comments to: Jim LaMorte jlamorte@telus.net