450 likes | 666 Views
Eastchester Union Free School District Pre-Bond Planning 2007-2008 Presenter: Marilyn Terranova, Ph.D. – Superintendent of Schools. Lower Level. First Floor. Third Floor. Second Floor. Eastchester Union Free School District Proposition One First Floor Middle School & High School.
E N D
Eastchester Union Free School DistrictPre-Bond Planning 2007-2008Presenter:Marilyn Terranova, Ph.D. – Superintendent of Schools
Lower Level First Floor Third Floor Second Floor
Eastchester Union Free School DistrictProposition OneFirst FloorMiddle School & High School
Eastchester Union Free School DistrictProposition OneFirst Floor Highlights
Old Gymnasium Revovated to New Cafeteria Capacity 260+
Commons: • Meeting space for student clubs during lunch hours • Small group instruction space during instructional time
Other school uses: • Study halls • Small group instruction • Community uses: • Holding large scale events that can be catered • General community meetings
First floor of the Eastchester High School to replace the footprint of the existing cafeteria
Eastchester Union Free School DistrictProposition OneSecond FloorMiddle School & High School
Eastchester Union Free School DistrictProposition OneSecond Floor Highlights
Mezzanine to High School Cafeteria Current old gymnasium
School uses: • Additional eating area for students • Meeting lunch space for staff • Small group instruction • Drop in study center • Wireless laptop use
New Middle School Elevator from 1st floor to 2nd floor ADA Requirement
Eastchester Union Free School DistrictProposition OneThird FloorHigh School
Eastchester Union Free School DistrictProposition OneThird Floor Highlights
Eastchester Union Free School DistrictProposition OneLower Level“Basement”“Utilizing Every Square Inch”
Eastchester Union Free School DistrictProposition OneLower Level Highlights
Lower Level High School
Eastchester Union Free School DistrictAdditional Needs“Proposition Two”
Instrumental Lesson Rooms Middle School Cafeteria Expansion
Two Instrumental Lesson Rooms 410 Square feet each
Instrumental Lesson Rooms Middle School Cafeteria Expansion
Middle School Cafeteria Expansion provides an additional 1235 square feet
Highlights There will be a bond referendum, comprised of 2 propositions, put before voters in the Eastchester School District on March 19, 2008. The plans for the renovation and construction project at the High School and Middle School include the following:
Proposition 1 ($19,600,000) • At Eastchester High School (largely using the existing building footprint where the cafeteria is currently located): • 7 NEW general education classrooms • 4 NEW small group instruction classrooms • 4 NEW science (lab) rooms • 1 NEW art classroom • 1 NEW physical education/fitness station • 4 NEW toilet rooms • 3 RENOVATED art classrooms • 2 RENOVATED small group instruction classrooms • Renovated cafeteria (relocated) with a commons and multi-purpose room and drop-in study center
Proposition 1 ($19,600,000) At Eastchester Middle School: • 4 NEW general education classrooms • 1 NEW technology classroom • 1 NEW science/lab • 1 NEW elevator
Proposition 2 ($1,285,000) At Eastchester Middle School: • 2 NEW instructional music/multipurpose rooms • Renovation/expansion of cafeteria
Thank You Dr. Terranova 914-793-6130 x4201
Bond Vote March 19th