An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Collimators Control P1

  2. Collimators controls P1 • Rack for 2 collimators • MDC drives the motors. Does not generate interlocks. • PRS monitors the position sensors and generate interlocks PRS MDC

  3. Collimators controls P1 • 1st event: • 5 Oct. 2010 • MDC lost communication during SB or after programmed dump. • MDC remotely reset then failed and replaced. • No interlock, no beam dump • After 14 hours of SB at 200 vs 200 bunches. • Not identified as SEU • 2nd event • 27 Apr. 2011 • MDC lost during SB at 480 vs 480 bunches. • no interlock, no beam dump • Remotely reset. • Exchanged for precaution • Identified as SEE

  4. Collimators controls P1 • 3rd event: • 1 May 2011 • PRS rebooted during SB with 768 bunches. • Interlock, beam dump • Clear signature of SEU. • Radiation levels in UJ14 last week as high as from start of LHC to week before. • A few 10^6 HEH (> 20 MeV).

  5. Collimator’s controls P1 • In UJ16 the situation is almost symmetric, for some reason the radiation levels are 1.4 times lower!

  6. Collimators controls P1 • Next days of SB will confirm (or hopefully not) whether it is really a SEU. • If confirmed, no quick solution at hand • Ralph proposes to close the TCL and see if it helps… • R2E integration of P1 completed, if necessary move of collimator’s rack may be anticipated • To be discussed if SEU and low cross section (few 10^-6 HEH) confirmed.