An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AMBER status and next runs F. Malbet/R. Petrov

  2. AMBER status • ALL HARDWARE IS INTALLED: • AMBER table with J, H, K, fibers and optics • Atmospheric Dispersion Compensator • Beam Commuting Device • Commissioning runs: 5 nights on UTs • Mainly performances for COM1 • Mainly search for low visibilities in COM2

  3. AMBER run history (2004-2005)

  4. AMBER offered to the community • LR-HK with K<=7 • MR-K with K<=4 • Open time observations started in October 2005 • First CfP in March 2005: • 48 proposals (incl. 7 GTO proposals) • 22 accepted and scheduled (incl.2 GTO) • Second CfP in October 2005: • 34 proposals (incl. 2 GTO proposals) • OPC has not decided yet

  5. AMBER Hardware • Stability • New screws have been installed on some translating stages (less hysteresis, more accurate,…) • Some support have changed • Base plates to be cut? Does not seem to be a problem anymore (?) • Fibers • Problem in August (?) • Fibers not responsible • New set of fibers to be ordered • Beam Commuting Device (BCD) • To be aligned(?) • Dewar to be opened?

  6. AMBER software • Operational at once in Medium Resolution • Some difficulties with Low Resolution • Grating wheel positioning • Spectral shifts between beams • Working in J, H and K simultaneousy • Fringe SNR is working both in MR & LR • Need to update amdlib (cf. Gérard & Evelyne) • Data reduction is converging

  7. Commissioning • Not enough runs to commission AMBER • COM1: AMBER running + first performances • COM2: looking for origin of low visibilities • TEC2: paranalization • Need of Commissioning for: • All spectral modes (J, H, K and HR) • ADC validation • Limiting magnitudes and performances

  8. AMBER results • GTO: • MWC 297: Malbet et al., A&A in press • Gamma Vel: Petrov et al., in prep. • Eta Car: Weigelt et al., in prep. • HD 104237: Tatulli et al., in prep. • HD 50013: Stee et al., in prep. • Exoplanets... • SDT: • CPD -57 4528: Domicinao et al., A&A in press • Alfa Arae: Meilland et al., in prep. • Sigma Orionis: Hummel -> de Wit • Other publications: • AMBER presentation: Petrov et al., in prep. • AMBER Data Reduction: Tatulli et al., in prep. • AMBER optical design: Robbe et al., in prep.

  9. AMBER GTO • 87 proposals, 600h of UTs, 1300h of ATs • 90h of GTO already used -> reshuffle • New GTO has been issued -> Large Program • Accepted by ESO • Publications made with initial 90h will be signed by all AMBER consortium members todate • Following GTO publications will be signed by at least all 5 laboratories (name will alternate).

  10. AMBER Data reduction • A paper has been written with principles, estimators and illustration • Amdlib is almost completed: there is a final rewriting for maintenance purpose. It will be delivered as a final product • Data reduction will continue within JMMC • A school is organized in June 2006 in Goutelas with other VLTI instruments • Mailing list exists…