80 likes | 90 Views
Preliminary result of the target polarization 2004. Kaori Kondo COMPASS target team. Polarization measurement 2004. downstream cell. upstream cell. 120. outer coil. inner coil (coil 6). Coil 6 does not work. 60 mm. f 15 mm. f 30 mm. NMR signals. magnetic field direction.
E N D
Preliminary resultof the target polarization2004 Kaori Kondo COMPASS target team
Polarization measurement 2004 downstream cell upstream cell 120 outer coil inner coil (coil 6) Coil 6 does not work. 60 mm f 15 mm f 30 mm
NMR signals magnetic field direction (spin anti-parallel to the field) negative polarization (spin parallel to the field) positive polarization always monitored!
building up polarization typical polarization buildup polarization (%) 1 day : +42% & -40% 2 days: +47% & -46% 3 days: +50% & -48% 5 days: +52% & -49% day relaxation time at 60 mK 2.50 T (normal frozen mode) 15000 hours at 60 mK 0.42 T (transverse mode) 1400 hours lost 0.7 % in 2 weeks lost 2~3 % in 5 days
upstream downstream signal area unit signal area unit 1/T 1/T TE calibration We had very good calibration with 5 temperature points. Errors from TE calibration can be about 1%
upstream relaxation time measurement TE calibration transverse 2 Aug. cooling water pressure downstream 20 Aug. cooling water stop thanks to Isabel
H E L P ! ! We would like target shift crews 21 Sept. ~ 4 Oct. Still 13 shifts are not occupied. Experienced people are welcomed. Have a look on: http://compass-target.web.cern.ch/compass-target/ -> shiftlist. Contact with Fabrice Gautheron for volunteering! Fabrice.Gautheron@cern.ch