Numerical Simulation of Earthworks and Retaining System for an Excavation F. Geiser and S. Commend GeoMod ing. conseils SA. Introduction. Offices and commercial building Lausanne region 120 x 35(max) x 9.3 m. Numerical modelling: 3D numerical simulation (Z_Soil)
E N D
Numerical Simulation of Earthworks and Retaining System for an Excavation F. Geiser and S. Commend GeoMod ing. conseils SA
Introduction • Offices and commercial building • Lausanne region • 120 x 35(max) x 9.3 m Numerical modelling: 3D numerical simulation (Z_Soil) 30’000 continuum elements
Geometry: structural elements Slurry wall
Hydrogeotechnical conditions 3.5 m 412.7 msm = 0.0 Remblai 9.3 m Glacio-sableux Glacio-argileux mou 8.0 m Fluvio-glaciaire Glacio-argileux Moraine Molasse imperméable Puits de décharge
Excavation stages Piles T = 0. Etat initial
Excavation stages T = 1. Excavation globale jusqu’à -3.0 m
zone A Excavation stages T = 2. Excavation zone A à -7.0 m, puis étayage à -2.5 m
Excavation stages T = 3. Excavation du reste à -7.0 m
Excavation stages T = 3.2. Excavation zone A jusqu’à -9.3 m (f.f.)
Excavation stages T = 3.4. Excavation de la moitié du reste jusqu’à -9.3 m
Excavation stages T = 3.6. Sous-radier à -9.3 m sur la moitié de la surface
T = 5 Excavation stages T = 4. Excavation du reste à -9.3 m, puis fin du sous-radier T = 5. Application des charges de service du bâtiment
uz B A Results: finalhorizontal displacements
17.2 m 15 m Water : particular study
Water : simplified 3D model 3.5 m 412.7 msm = 0.0 Remblai K = 10-5 m/s épaisseur = 3.5 à 7.5 m 9.3 m Glacio-sableux K = 10-5 m/s épaisseur = 4 m Glacio-argileux mou K = 10-10 m/s épaisseur = 7.6 m 8.0 m Fluvio-glaciaire K = 10-3 m/s épaisseur = 3.7 m Glacio-argileux K = 10-8 m/s épaisseur = 4 m Moraine K = 10-9 m/s épaisseur = 6 m Molasse imperméable Well (modelwith/without) K = 10-3 m/s e= 15 m
Tranche 3D avec puits, esp. = 15 m Coupe 2D avec tranchées drainantes A = 15 * 17.2 = 258 m2 Water : simplified 3D model with well
Water : simplified 3D model Clay – low permeability e
Low permeability High permeability Water : 3D model
Water : 3D model 1625 m3 / jour
Water : 3D model Impermeable wall 0.04 m3 / jour
Temperature effect on bracing : 2D modelgeneral considerations for DT = 30 ° Free truss: Dl = aDT L/2 = 5 mm Fixed conditions DF = 1000 kN Imposed displacement DF = 165 kN Dux imposé = - 5 mm Dux = - 4.2 mm
T : from 10 °C to 40 °C => DT = 30 °C Temperature effect on bracing : 2D modelimposing DT on bracing (Q4) T = 10 °C = cte
Temperature effect on bracing : 2D modelimposing DT on bracing Dux = 0 (imposed) DN=230 kN
Conclusions • Currently under construction • Predictions in the range of deformations and forces • Horizontal displacements slightly > measurements • Linked mainly to: • - « conservative » evaluation of f and c • - real water behaviour