An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. West African Power Pool (WAPP)

  2. West African Power Pool Members • SBEE (Benin) • SONABEL (Burkina Faso) • SOGEPE (Côte d’Ivoire) • SOPIE (Côte d’Ivoire) • NAWEC (The Gambia) • ECG (Ghana) • VRA (Ghana) • EDG (Guinea) • LEC (Liberia) • EDM (Mali) • PHCN (Nigeria) • SENELEC (Senegal) • NPA (Sierra Leone) • CEB (Togo / Benin) • SOGEM (Senegal / Mali / Mauritania)

  3. West African Power Pool – Overview • Pool created in 1999 • Main objective: to promote infrastructure development in West Africa and develop an integrated, sustainable, regional electricity market • Key activities undertaken so far: • Revised ECOWAS Master Plan 2004 • World Bank $350 million WAPP APL loan program approved 2005 • WAPP organisation established as association of utilities 2006 • WAPP donor coordination (10th meeting of committee, Paris Sept 2006) • Operation Manual for interconnected system, Sept 2006 • Next key activities planned: • Close finance for Volta-Momé Hagou-Sakété 330kV interconnection (Ghana-Togo-Benin) • Pre-investment studies for interconnections Ghana-Burkina Faso and Ghana-Burkina Faso-Mali during 2007 • Mobilising funds for OMVG (donors conference, January 2007) • Mobilising funds for Liberia-Sierra Leone-Guinea • Securing finance for emergency power support programmes throughout the sub-region • Medium voltage cross-border projects

  4. Current WAPP Projects – Generation Nr. Project name Country (ies) Type(1) Status Est. Project Completion 1 Papalanto, Omotso, Geregu, Alaoji, Eyaen, Sapele, Egbema, Gbarain, Omoku, Ibom, Alscon, Calabar Nigeria GAS GEN Under construction 2007-8 2 Kounoune I, Kounoune II Senegal DIV GEN Under construction 2007-8 3 Takoradi conversion to gas plus steam turbine Ghana GAS GEN Bid process 2007-8 4 Félou Mali HYD GEN Bid process 2010 (1) Key: REHAB: rehabilitation and expansion project – HYD GEN: hydropower plant – GAS GEN: gas-fired generation project DIV GEN: other type of power plant – TRANS: transmission project – DIST: distribution project – OTHER: other type

  5. Current WAPP Projects – Transmission Nr. Project name Country (ies) Type(1) Status Est. Project Completion 5 Ikeja West – Sakété Nigeria-Benin TRANS Under construction 1Q 2007 6 Aboadze-Volta Ghana TRANS Under construction 2008 7 Bobo Dioulasso-Ouagadougou Burkina Faso TRANS Bid process 2008 8 Volta-Momé Hagou-Sakete Ghana-Togo-Benin TRANS Securing finance 2009 (1) Key: REHAB: rehabilitation and expansion project – HYD GEN: hydropower plant – GAS GEN: gas-fired generation project DIV GEN: other type of power plant – TRANS: transmission project – DIST: distribution project – OTHER: other type

  6. Upcoming Key WAPP Projects (I) Nr. Project name Country (ies) Type(1) Est. cost ($M) Est. Readiness 1 Tema Ghana GAS GEN 250 2007 2 OMVG Guinea, Guinea-Bissau, The Gambia, Senegal HYD GEN TRANS 1000 2007 3 Kainji, Jebba Nigeria REHAB (HYD GEN) 100 2007 4 Aboadze-Prestea-Kumasi-Wa-Han-Tumu Ghana TRANS 240 2007-8 (1) Key: REHAB: rehabilitation and expansion project – HYD GEN: hydropower plant – GAS GEN: gas-fired generation project DIV GEN: other type of power plant – TRANS: transmission project – DIST: distribution project – OTHER: other type

  7. Upcoming Key WAPP Projects (II) Nr. Project name Country (ies) Type(1) Est. cost ($M) Est. Readiness 5 Bolgatanga-Ouagadougou Han-Bobo Dioulasso-Sikasso-Bamako Ghana-Burkina Faso Ghana-Burkina Faso-Mali TRANS 330 2007-8 6 OMVS Mali, Mauritania, Senegal, Guinea HYD GEN TRANS 250 80 2008 7 Information & Coordination Centre (ICC) West Africa (ICC located Benin; comm’s with national control centres) OTHER (ICC Building, Equipment, Communications) 65 2008-9 8 Liberia-Sierra Leone-Guinea Côte d’Ivoire-Liberia-Sierra Leone-Guinea TRANS HYD GEN 340 450 2008-9 (1) Key: REHAB: rehabilitation and expansion project – HYD GEN: hydropower plant – GAS GEN: gas-fired generation project DIV GEN: other type of power plant – TRANS: transmission project – DIST: distribution project – OTHER: other type