1 / 18

Blocks 2 & 3 Overview

Blocks 2 & 3 Overview. Samuli Vuokila Air Navigation Commissioner International Civil Aviation Organization. Blocks 2 and 3. Performance Improvement Areas. Block 0 (2013). Block 1 (2018). Block 2 (2023). Block 3 (2028 & >). Airport Operations. Globally Interoperable Systems and Data.

Download Presentation

Blocks 2 & 3 Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner International Civil Aviation Organization

  2. Blocks 2 and 3 Performance Improvement Areas Block 0 (2013) Block 1 (2018) Block 2 (2023) Block 3 (2028 & >) Airport Operations Globally Interoperable Systems and Data Optimum Capacity and Flexible Flights Efficient Flight Path Preparatory Workshop for AN-Conf/12

  3. Longer-term Objective: High Performance • 4 Main Performance improvement areas • Airport operations • Globally interoperable systems & data • Optimum capacity & flexible flights • Efficient flight path • … increasingly interrelated as ATM is closer to optimum functioning Preparatory Workshop for AN-Conf/12

  4. Block Maturity Lifecycle Planning Decisions B3 2028+ based on business case and validation results as developed during the previous phase B2 2023 B1 SIMPLIFIED LIFECYCLE V0 Identification of Needs V1 V1 Concept Definition B0 V2 V2 Feasibility R&D Pre-Industrial Development and Integration - V3 V3 Industrialisation V4 V4 Implementation V5 Deployment V5 Decision V6 Operations V6 Decision Operations V7 Decommissioning V7 Decision Decision IOC Initial Operational Capability Standardisation activities B2: from 2023 B3: from 2028 & beyond Preparatory Workshop for AN-Conf/12 4

  5. 3 Essential Considerations in the Global ATM Operational Concept The network of actors & assets The flight trajectory over time Measured business performance Trajectory Network Performance Informed decisions taken collaboratively on early and accurate information Partnership – Interoperability SWIM and data comm. are cornerstones Preparatory Workshop for AN-Conf/12 5

  6. International Technical Challenges • To ensure interoperability, in particular • Common time reference • New flight plan / flight object (FF-ICE) • 4D Trajectory exchange format • Information Management (data models, quality of service requirements, sharing rules, distribution process) • D/L applications for trajectory data exchange • Procedures for delegation ATC/Pilots • Time based separations • New wake vortex separations based on time • Participation of all airspace users Will require new ICAO material and industry standards Preparatory Workshop for AN-Conf/12 6

  7. Global Perspective Global traffic development spreads the same issues globally -> We need global standards/interoperability, and not wait too long for that -> Too many intermediate steps/standards make evolution more difficult Deployment where and when needed, but based on common principles/rules/data & interoperable technologies -> One size does not fit all -> B2/3 implementation decisions not required now! Cooperation early in life cycle is more efficient -> Among programmes, within/across regions, with ICAO -> On requirements, R&D activities Preparatory Workshop for AN-Conf/12 7

  8. Block 2 in Perspective Performance Improvement Areas Airport Operations Information Globally Interoperable Systems and Data B2-31 – Enabling airborne participation in collaborative ATM through SWIM Optimum Capacity and Flexible Flights Efficient Flight Path Network B2-35 – Increased user involvement in the dynamic utilisation of the network ToC ToD B2-05 – Optimized Arrivals in Dense Airspace B2-101 – New Collision Avoidance system B2-15 – Linked AMAN/DMAN B2-85 – Airborne Separation CTA B2-90 – RPA integration in traffic B2-25 – Improved coordination through multi-centre ground-ground integration (FF-ICE/1 & flight object, SWIM) B2-70 – Advanced Wake Turbulence Separation B2-75 - Optimised surface routing and safety benefits Infrastructure Preparatory Workshop for AN-Conf/12 8

  9. From Block 2 to Block 3 Performance Improvement Areas Airport Operations Information Globally Interoperable Systems and Data B3-105 – Enhanced operational decisions through integrated meteorological information (near-term and immediate service) B2-31 – Enabling airborne participation in collaborative ATM through SWIM Optimum Capacity and Flexible Flights B3-10 – Traffic Complexity Management Efficient Flight Path Network B2-35 – Increased user involvement in the dynamic utilisation of the network B3-05 – Full 4D Trajectory-based Operations ToC ToD B2-05 – Optimized Arrivals in Dense Airspace B2-101 – New Collision Avoidance system B2-15 – Linked AMAN/DMAN B3-85 – Self Separation B3-15 – Integration of AMAN/DMAN/SMAN B3-15 – Integration of AMAN/DMAN/SMAN B2-85 – Airborne Separation CTA B2-90 – RPA integration in traffic B3-90 – RPA Transparent Management B2-25 – Improved coordination through multi-centre ground-ground integration (FF-ICE/1 & flight object, SWIM) B3-25 – Improved Operational Performance through the introduction of Full FF-ICE B2-70 – Advanced Wake Turbulence Separation B2-75 - Optimised surface routing and safety benefits Infrastructure Preparatory Workshop for AN-Conf/12 9

  10. Block 3 in Perspective Performance Improvement Areas Airport Operations Information Globally Interoperable Systems and Data B3-105 – Enhanced operational decisions through integrated meteorological information (near-term and immediate service) Optimum Capacity and Flexible Flights B3-10 – Traffic Complexity Management Efficient Flight Path Network B3-05 – Full 4D Trajectory-based Operations ToC ToD B3-85 – Self Separation B3-15 – Integration of AMAN/DMAN/SMAN B3-15 – Integration of AMAN/DMAN/SMAN CTA B3-90 – RPA Transparent Management B3-25 – Improved Operational Performance through the introduction of Full FF-ICE Infrastructure Preparatory Workshop for AN-Conf/12 10

  11. B2-31 – Enabling airborne participation in collaborative ATM through SWIM B3-25 (Full FF-ICE) B1-30 (Digital information) B3-105 (tactical weather) B2-31 B1-31 (SWIM) B3-5 (Full 4D TOps) Preparatory Workshop for AN-Conf/12 11

  12. B2-35 – Increased user involvement in the dynamic utilisation of the network B1-30 (Digital information) B3-25 (Full FF-ICE) B1-30 B3-25 B1-35 (Network Ops Plan) B2-35 B3-10 (complexity managemt) B2-25 (FF-ICE/1) Preparatory Workshop for AN-Conf/12 12

  13. B3-05 – Full 4D Trajectory-based Operations B3-10 (complexity management) B1-5 (Improved Descent Profiles ) B2-31 (Airborne SWIM) B3-5 B2-35 (Network Ops Plan) B3-25 (Full FF-ICE) B2-25 (FF-ICE/1) Preparatory Workshop for AN-Conf/12 13

  14. B2-90 – RPA integration in traffic B2-100 (New CAS) B1-90 (Initial RPA integration) B2-90 B3-90 Preparatory Workshop for AN-Conf/12 14

  15. B3-90 – RPA transparent management B2-100 (New CAS) B1-90 (Initial RPA integration) B2-90 B3-90 Preparatory Workshop for AN-Conf/12 15

  16. Challenges - How to Get There? Technical evolution towards Global ATM Concept Multi-facility (ATC, aircraft, airport) consistency Network-wide effects increase interdependence & sensitivity of solutions to local situations & perturbations Increased cooperation within regions to optimise synchronised deployments Inter-regional flights & cooperation as cement Particular care to non-nominal situations upstream in the work Need for interoperability / new standards Validate, demonstrate, standardise Preparatory Workshop for AN-Conf/12 16

  17. Challenges - How to Get There? Ensure timely success of B0 & B1 As success story of an unprecedented global effort As preparatory/initial steps (not requiring implementation of all modules) To ensure availability of resources Agree on the way ahead and research programme No implementation decision now! Preparatory Workshop for AN-Conf/12 17

More Related