1 / 17

Closing remarks

Closing remarks. Makoto Asai and Marc Verderi 2012 Geant4 Collaboration Meeting Chartres. We made progress. We could have made solid steps and also solid work plan toward the version 9.6 release in November 2012 and version 10.0 in November 2013.

cedric
Download Presentation

Closing remarks

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Closing remarks Makoto Asai and Marc Verderi 2012 Geant4 Collaboration Meeting Chartres

  2. We made progress • We could have made solid steps and also solid work plan toward the version 9.6 release in November 2012 and version 10.0 in November 2013. • Let’s keep working together toward our targets. • We could also have productive discussions on improving our credibility, and brainstormed for our longer term strategic plan. Meeting goals - Makoto Asai and Marc Verderi

  3. Timeline toward Geant4 version 10 • Geant4 9.6 release on Nov.30 • Must already include “obsoleting” messages for functionalities planned for removal in the major release of 2013 • Dec 2012 • Drop obsolete classes/methods and code cleanup • Jan 2013 • Conversion of (cleaned) v9.6 to G4MT • Adiabatically integrate Geant4-MT 9.6 features to main development trunk • Developments toward version X will be made to main trunk as usual • Patches to release 9.6 will be included in dedicated SVN branch • Feb-May 2013 • Adaptation of system testing and CMake build system • Migration of relevant examples and tests • Stress tests for both CPU and physics performance • June 2013 • Beta release : all changes for multi-threading and interfaces should be included • Nov 2013 • Final major release Meeting goals - Makoto Asai and Marc Verderi

  4. Credibility • The key of our past, current and future success is satisfaction of our customer users. We have to make them feel well taken care of and well supported. • There are many open bug reports. Please update bug report you are assigned to. • The Steering Board is now checking every open bug report at every SB meeting. • There are many unattended HyperNews postings even though they are asking reasonable questions. We have to address to them. • Join the collaboration-wide efforts. • Testing, computing and physics performance monitoring • Examples, documentation, web • Publication • Please encourage your local users to attend to the Technical Forum. • If needs are, we may have it more than 4 times a year, and you may locally host it. • Let’s discuss how we can refine our user-support processes. Meeting goals - Makoto Asai and Marc Verderi

  5. Before we conclude the collaboration meeting • Before we move to the final slides, let’s see some presentations outside of this collaboration meeting. • CHEP2012 • Transforming Geant4 to the Future Workshop • Open Symposium of European Strategy Preparatory Group Meeting goals - Makoto Asai and Marc Verderi

  6. Meeting goals - Makoto Asai and Marc Verderi

  7. Meeting goals - Makoto Asai and Marc Verderi

  8. Meeting goals - Makoto Asai and Marc Verderi

  9. Meeting goals - Makoto Asai and Marc Verderi

  10. Meeting goals - Makoto Asai and Marc Verderi

  11. Meeting goals - Makoto Asai and Marc Verderi

  12. Meeting goals - Makoto Asai and Marc Verderi

  13. These slides should be read… • We have achieved tremendous job and Geant4 now wins a big success. But we need to do more, and people expect our further achievements. • Physics performance and rich functionality are essential. No doubt on this. • But we need to put our major efforts on improving the cost performance of Geant4-based simulation. No single solution here. • Code cleanup, data locality improvements, richer event biasing options, multi-threading, code reengineering, new trends e.g. GPGPU, etc. • Just a 10% performance improvement benefits millions of dollars for LHC, for example. Meeting goals - Makoto Asai and Marc Verderi

  14. Last year we concluded the collaboration with this slide. Meeting goals - Makoto Asai and Marc Verderi

  15. Meeting goals - Makoto Asai and Marc Verderi

  16. So, this year we conclude with this. Meeting goals - Makoto Asai and Marc Verderi

  17. Last slide • Thank you for your participation and contribution! • Please join warmest appreciation to • Alex Howard and Alberto Ribonas the program committee, • IvanaHrivnacovaand Laurent Garnier as the program committee and local organizer, • Nora, Sylvaine, Sarah, Thu and Marina for their most devoted supports, and • Marc Verderi. Since we couldn’t be here without his dedication. • See you all at Seville next year! Meeting goals - Makoto Asai and Marc Verderi

More Related