1 / 9

Workshop 7 – Thessaloniki 24th February 2011 p

Workshop 7 Business models, regulatory framework, local authority and private operators involvement Thessaloniki, Greece 24 th February 2011. Opening Session. Title: An overview on FLIPPER Project. Presented by: Dora Ramazzotti, SRM, IT. Workshop 7 – Thessaloniki

cerise
Download Presentation

Workshop 7 – Thessaloniki 24th February 2011 p

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Workshop 7 Business models, regulatory framework, local authority and private operators involvement Thessaloniki, Greece 24th February 2011 Opening Session Title: An overview on FLIPPER Project Presented by: Dora Ramazzotti, SRM, IT Workshop 7 – Thessaloniki 24th February 2011p

  2. The FLIPPER Project • Title: Flexible Transport Services and ICT platform for Eco-Mobility in urban and rural European areas • FLIPPER is funded via EU INTERREGIVC programme • Length: 36+3 months (Sept 08 – Nov 11) • Objective: Exchange of experience and transfer of knowledge on Flexible Transport Services • Co-ordinator:The FLIPPER initiative is led by the Public Transport Authority of Bologna (SRM) • Partnership: 11 partners – mix of academics and practitioners (local municipalities, authorities and bus operators) Workshop 7 – Thessaloniki 24th February 2011p

  3. The FLIPPER Consortium 7 EU Countries - 11 partners: • SRM - Reti e Mobilità (IT) LEADER • ATL – Livorno PT operator (IT) • ATAF – Florence PT operator (IT) • University of Thessaloniki (AUTH, GR) • University of Bodenkultur, Wien (BOKU, AT) • Municipality of Purbach (AT) • University of Aberdeen (UK) • DOYK, Volos (GR) • InsularCouncil of Formentera (ES) • Municipality of Almada (PT) • Ring a Link , not-for- profit organisation (RAL, IE) • Overall budget: • € 2.969.000,00 • Funded 75-85% Interreg IVC • Co-fundedby National Governements Workshop 7 – Thessaloniki 24th February 2011p Workshop 7 – Thessaloniki 24th February 2011p

  4. What have we been doing in FLIPPER? Brochures - Newsletters Web-site www.interreg4cflipper.eu Virtual Library Transferring Knowledge • Training courses • Workshops • Dissemination • Knowledge Raising • 12 Feasibility studies • [Bologna-IT, Budrio-IT, Livorno-IT, Scandicci-IT, Defereggental-AT, Purbach-AT, Kastoria-EL, Langadas-EL, Volos-EL, Formentera-ES, Almada-PT, South Tipperary-IE] • 6 Pilot applications • [Bologna-IT, Purbach-AT, Kastoria-EL, Volos-EL, Formentera-ES, South Tipperary-IE] Workshop 7 – Thessaloniki 24th February 2011p

  5. The Feasibility Studies • The 12 feasibility sites have different characteristics and needs, thus allowing the investigation of the impacts of the proposed flexible transport solutions across a range of operational environments • analysis of existing mobility demand and PT services currently offered at each site; • assessment of citizens needs + • operational, financial and organisational constraints; • the definition of the most suitable mobility service schemes for improving and extending accessibility and reducing the environmental impacts • (most suitable will not always be FTS) Workshop 7 – Thessaloniki 24th February 2011p

  6. The Pilots • Drawing on the outputs from the feasibility studies, 6 sites will be fully developed into pilot applications. • The implementation of the pilots will include: • design and implementation of ICT solutions supporting operation and coordination of FTS ; • implementation of the supporting organisational measures required to achieve the planned FTS; • start up the pilot demonstration; • data collection and evaluation of the FTS impacts; • identification and transfer of good practices. Workshop 7 – Thessaloniki 24th February 2011p

  7. Workshop 7 – Thessaloniki 24th February 2011p

  8. Workshop 7 – Thessaloniki 24th February 2011p

  9. thanks for your attention  dora.ramazzotti@srmbologna.it www.interreg4cflipper.eu

More Related