AGENDA • Introduction to Scotoil Group & Scotoil Services • Equipment subject to NORM - ‘Rogue’s Gallery’ • Equipment Decontamination Procedure Step by Step, Aberdeen • Disposal Route - Compliance with Regulations • Scotoil - Oilfield Environmental Services Equipment Decontamination Procedure Step by Step, Cairo QUESTIONS ?
EUROPE Scotoil Group plc headquarters in Aberdeen, Scotland INTERNATIONAL MIDDLE EAST Alliance between Scotoil Services (Middle East) Ltd and Gulf Environmental Company LLC (GENCO), based in Abu Dhabi, UAE NORTH AFRICA Oilfield Environmental Services (OES) - JV company based in Cairo, Egypt
More than 20 years’ experience OUR CREDENTIALS • SCOAA Environment award recognising “world class standards” • Operations meet exacting standards of regulatory and assessment bodies • ISO 9001:2000, ISO 14001 • FPAL • Scotland’s Health at Work Gold Award
Equipment decontamination OUR SERVICES • Removal and disposal of NORM • Instrumentation • Onshore and offshore RPS • Emerging technologies in water purification and land remediation
High Pressure Generally for component parts and tubulars • Ultra High Pressure - Trials More efficient tubular cleaning Increased throughput More effective cleaning of lead contaminated tubulars EQUIPMENT DECONTAMINATION
Disposal facility regulated by SEPA REMOVAL AND DISPOSAL OF NORM • UK’s first authorised NORM removal and disposal facility • Environment controls through independent impact assessments and monitoring • Accountability - operational controls and licensed disposal route
INSTRUMENTATION SERVICES • Scotoil Services offers a complete radiological instrumentation package: • Equipment training • Sales • Rental • Repair • Calibration • Certification MINI 900 SERIES MONITOR ELECTRA CONTAMINATION METER
Radiological surveys RPS SERVICES • RPS control during workovers etc. • Induction training • Personnel monitoring • Documentation • Supply of appropriate PPE
Formation water contains naturally-occurring mineral salts WHAT IS NORM SCALE? • These salts can come out of solution in contact with injected water • Radium may be present in minute concentrations • Naturally radioactive, radium may mean the scale is classified as radioactive
Specific Activity • Activity per gram i.e. Bq/gram UNITS OF MEASUREMENT • Surface Contamination • Activity per cm squaredi.e. Bq/cm2 • A contamination monitor can measure surface activity
Measured in sieverts { large unit} - usually prefix sub multiplier e.g.1 µSv {micro sievert} DOSE RATES • Dose rates greater than 2.5 µSv/hr mark supervised areas • Dose rates greater than 7.5 µSv/hr mark controlled areas
Naturally occurring radioactive material is a major issue for • field operation • decommissioning WHAT IT MEANS FOR THE INDUSTRY • NORM scale build up can render equipment inoperable • Classed as radioactive, its removal and disposal must be carefully controlled
Colour varies from white through to brown TYPES OF EQUIPMENT SUBJECT TO NORM - ‘ROGUES GALLERY’ • Barium Sulphate scale is most common • Spongy open appearance if large quantities of scale inhibitor used
Radiation dose THE HAZARDS • Inhalation • Ingestion • Cuts and abrasions
Step by Step EQUIPMENT DECONTAMINATION PROCEDURE
Written notification from the Operator of NORM consignment • Identified offshore by platform/rig RPS • Scotoil authorised to accept contaminated equipment • Contamination levels monitored on arrival EQUIPMENT DECONTAMINATION
Unload equipment into Controlled Area • Enter job details on computerised Job Register
Scale sample passed to Laboratory • Radiological analysis, total activity, type of scale
Arrival, Documentation Check & Inspect Tubulars - check internal, external pin, box, scale thickness, activity for each joint • Unique Job No - waterproof tag, client, location • Complete monitoring records for each item or component part • All joints capped or re-wrapped
Decontamination of Equipment • Pre-cleaning prior to stripdown • Stripdown if required • Soluble abrasives can be used to assist decontamination • Full decontamination • Post, Final & QC Inspection
Ultra High Pressure Pump Unit • 36,000 psi working pressure at 42 litres per minute High Pressure Aqua Pumps • 10,000 psi working pressure at 82 litres per minute
Tubular Decontamination System • High Pressure jetting combined with lance mounted cutter ‘Rattler head’
Tubular Ends - Fully Enclosed Hoods • All Scale & cleaning water collected to sump
Lance Mounted Cutter Head ‘Rattler’ • Machine with hardened cutting surfaces
All Scale ground down to less than <250 microns • All Scale passed through screens • Oil Separator - two stage • Controlled discharged to sea regulated by SEPA • Post Cleaning Monitor Record • Final Check Monitor Record
Results of radiochemical analysis on computerised Job Register • Certificate of Scale Disposal - master job file • Quarterly Scale Disposal computerised records • Quarterly Sea Survey - results, particle size analysis to radiation specialists at SEPA (Scottish Environment Protection Agency) SCALE DISPOSAL
Compliance with HSE Regulations • Ionising Radiation Regulations 1999 • Control of Pollution Act 1974* • Radiation Substances Act 1993 • Environmental Pollution Act 1990 • Registered under the pipeline Act 1962 • Authorisation for the Accumulation and Disposal of Radioactive Waste* * Regulated by SEPA (Scottish Environment Protection Agency)