An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FMANZ SUMMIT 201720-30% OF YOUR CURRENT ENERGY USE IS PROBABLY WASTE JEREMY ALLEN, FOUNDER, ENERGY SOLUTION PROVIDERS

  2. Who Energy Solution Providers (ESP) Specialising in the installation of high accuracy, automated remote metering systems Across commercial, public, Industrial, retail and educational facilities New Zealand wide

  3. CASE STUDY SUMMARY

  4. BUILDING 1 – Issue 1 No Data After installing 33 ESP Meters

  5. BUILDING 1 BASELINE YEAR 33 ESP METERS INSTALLED ENERGY AUDITS/FD REVIEW BUILDING OPTIMISATION/ CCX

  6. KEY ISSUES – HEATING COOLING FIGHTING

  7. Building 1 – Results to date (5 years) 18% $569,000 3,794,379 kWh

  8. Building 2 – Summary

  9. BUILDING 2 - Project Overview PREDICTED ENERGY CONSUMPTION 90 ESP METERS INSTALLED ENERGY AUDITS/FD REVIEW BUILDING OPTIMISATION/ CCX

  10. BUILDING 2 – 90 meters NABERSNZ base build compliant

  11. Immediate Findings

  12. KEY ISSUES – HOLIDAY SCHEDULES

  13. Building 1 – Results to date (12 months) 26% $129,469 863,130 kWh

  14. SUMMARY OF COMMON ISSUES Problems from Day1 • Pressures from the construction project • Specification and selection of plant equipment is often problematic from tender stage Short Term Operation • Reactive maintenance • Changing tenants or space usage is fairly common • Often things that aren’t working are just switched to manual control just to get it working Long Term Operation/degradation • As equipment age they lose efficiency • BMS equipment becomes obsolete (10-15 years)

  15. EUI BENCHMARK OPPORTUNITIES FOR IMPROVEMENT SHOULD BE INVESTIGATED GREEN 0 150 200 100 50 250 Energy Use Index kWh/m2*pa

  16. “50 percent of initial energy savings disappear within the first six to 12 months due to a lack of continuous monitoring, analysis and corrective action.” -Accenture (What’s Wrong with Traditional Energy Management) https://www.accenture.com/id-en/~/media/Accenture/Conversion-Assets/DotCom/Documents/Global/PDF/Operations_1/Accenture-Traditional-%20Energy-Management.pdf