60 likes | 213 Views
Project of construction work Church of the Nazarene. “C UTERVO – CAJAMARCA -PERU”. Geographic Location. Cutervo, province of the departament of Cajamarca , has a population of about 138 thousand people. CURRENT STATE OF THE TEMPLE.
E N D
Project of construction work Church of the Nazarene “CUTERVO – CAJAMARCA -PERU”
Geographic Location Cutervo, province of the departament of Cajamarca , has a population of about 138 thousand people.
CURRENT STATE OF THE TEMPLE The temple has 3 floors of rustic material, that is, adobe and stone. It is 45 years old. DECLARED IN EMERGENCY BY CIVILDEFENSE
DESIGN OF CONSTRUCTIÓN Construction Project Cost S/. 800 000 40 % self- finacing nature 60 % national & international help.
FINAL CONSTRUCTION TEMPLE 3 floors of 15 x 30 meters First floor: a public funeral awake. Second floor: A mini auditorium and clasrooms for workshops. Third floor:Temple, Pastoral and administrative house.
THANKS Withyourhelp, wewillgetourdream and getting soulsfortheKingdom of Christ. Committee pro-construction