70 likes | 196 Views
STARDUST Project CRITICAL EVENTS READINESS REVIEW COMET P/WILD 2 ENCOUNTER Communications During Flyby Scott Toro-Allen. JPL: 303-411 AM / 301-427 PM LMA: MSA +1 818 354-1275 08:00 AM - 05:00 PM PST 20 Nov 2003. Stardust Telecom Component Locations. 2 Days Surrounding Closest Approach
E N D
STARDUST Project CRITICAL EVENTS READINESS REVIEW COMET P/WILD 2 ENCOUNTER Communications During Flyby Scott Toro-Allen JPL: 303-411 AM / 301-427 PM LMA: MSA +1 818 354-1275 08:00 AM - 05:00 PM PST 20 Nov 2003 CERR - Toro-Allen
Stardust Telecom Component Locations CERR - Toro-Allen
2 Days Surrounding Closest Approach Downlink HGA; 15800 Bps With 1 Degree HGA “Off Earth Angle” at Encounter Attitude (Offpoint Near 0 at Closest Approach) Uplink MGA Can Support 125 Bps 0.25 Degree Deadband; MCD 3 (15 1/6 Encoding) 70 Meter Station Coverage Closest Approach Downlink on MGA; Carrier Only (See Following Chart) Potential 3 Db Drop on SSPA 1 RF Power Output (Trapped Charge Effect) Uplink MGA Can Support 125 Bps 0.25 Degree Deadband 70 Meter Station Coverage (DSS-14 / DSS-43) Communications Strategy CERR - Toro-Allen
Roll Angle Options CERR - Toro-Allen
Telecom Subsystem Details • Subsystem Performance Is Nominal (Links Are Sized for Worst-case Deadbanding) and Usually Exceeds Predictions • System-Level Fault Protection Detections Are Enabled; Responses Disabled During Encounter with the exception of ULLE and DLLE • ULLE timer is spacecraft-based; DLLE is ground commanded • Component-Level Fault Protection Detection/Responses Enabled • Command Loss Timer Protects Encounter Uplinks Due to Telecom Component Fault Using Odyssey MOI Model • CLT 17 Days Until 12/12; Then Set to 10 Days • 12/17 » 5 Days; 12/19 » 3 Days; 12/20 » 2 Days; 12/28 » 1 Day • 12/31 Through Encounter » 18 Hours • 1/3/04 Set Back to 17 Days CERR - Toro-Allen
TFP Run from STL results - Downlink CERR - Toro-Allen
TFP Run from STL results - Uplink CERR - Toro-Allen