TDC2/TCC2 consolidation. EATM 15/07/2014. EN/EL. DC and control cable identification and cut completed Old light removal in TDC2 New AUG installed. Demin . circuit valve replacement. Remplacement des vannes terminé. Unités de ventilation. Travaux terminés. XTAX upgrade.
E N D
TDC2/TCC2 consolidation EATM 15/07/2014
EN/EL • DC and control cable identification and cut completed • Old light removal in TDC2 • New AUG installed
Demin. circuit valve replacement • Remplacement des vannesterminé
Unités de ventilation • Travauxterminés.
XTAX upgrade • 12/12 XTAX tables XTAX repaired • Still alignment issue for XTAX T4 • This week: survey & test on XTAX T6 + roof closure
Magnet • Manifolds re-installed
OTND (Onetnucleaire) • Nettoyage 3 eme chateau XTAX OK • Démontagepasserelle et chemins de câbles en cours