1 / 11

TDC2/TCC2 consolidation

TDC2/TCC2 consolidation. EATM 15/07/2014. EN/EL. DC and control cable identification and cut completed Old light removal in TDC2 New AUG installed. Demin . circuit valve replacement. Remplacement des vannes terminé. Unités de ventilation. Travaux terminés. XTAX upgrade.

Download Presentation

TDC2/TCC2 consolidation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TDC2/TCC2 consolidation EATM 15/07/2014

  2. EN/EL • DC and control cable identification and cut completed • Old light removal in TDC2 • New AUG installed

  3. Demin. circuit valve replacement • Remplacement des vannesterminé

  4. Unités de ventilation • Travauxterminés.

  5. XTAX upgrade • 12/12 XTAX tables XTAX repaired • Still alignment issue for XTAX T4 • This week: survey & test on XTAX T6 + roof closure

  6. Magnet • Manifolds re-installed

  7. OTND (Onetnucleaire) • Nettoyage 3 eme chateau XTAX OK • Démontagepasserelle et chemins de câbles en cours

  8. OTND (Onetnucleaire)

  9. Oculus porte

  10. Dose

  11. Planning

More Related