An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Geo- and Hydro Geology Projects

  2.  Supervision & Consultancy of the drilling works of the Great Man-made River Project Libya Client: General WaterAuthority of Libya, Tripoli , 1994-2002 Project Description: The largest water supply project in the World, over $ 25 Billion investment 1994-2002 Consultancy and Supervision of the drilling Activity at Great-man-made River Project General Water Authority of Libya, Tripoli Out of 1300 wells planned, 726 wells were completed under the suprvision of Er-Petro.there are currently 1116 production wells in the project, producing a total of 6.5 million cubic meters of water daily, and divided as follows: The following wells were supervised by Er-Petro: - 476 wells in Hasouna field- 126 wells in Sarirfield- 108 wells in Tazerbo field- 16   wells in Jaghboubfield

  3. JointGeologial Mapping inHaruj Al Abyad Client: Industrial Researh Centre of Libya, Tripoli, 2002 – 2003 Partner: Industrial Researh Centre of Libya Project Description: Er-Petro participated three mapping projectsin a scale 1:250.000 under Technical and Scientific co-operation with the Industrial Research Centre of Libya. One of theseprojectswasHaruj Al Abyadarea. GeologicalFieldMapping SampleAnalysis Preparing map sheetsfromthearea ApplyingdatatotheGeologicalInformation System

  4. JointGeologial Mapping inWawAlKabir Client: Industrial Researh Centre of Libya, Tripoli, 2004 – 2005 Partner: Industrial Researh Centre of Libya Project Description: Er-Petro participated three mapping projects under Technical and Scientific cooperation with the Industrial Researh Centre of Libya. One of thesewasHaruj Al Abyadarea. GeologicalFieldMapping SampleAnalysis Preparing map sheetsfromthearea ApplyingdatatotheGeologicalInformation System

  5. Reservoir Simulation Study on DahraField(Gas) Client: PlanningDepartment of WahaOilCompanyLibya, Tripoli, 2006 – 2008Partner: Petroleum Research Centre of Libya, Tripoli Project Description: The main objectives of thequantitativewell log evaluation made inthedepth is a part of the project consisted of fivewellselectedfromthreehydrocarbon-bearingreservoirs. Detection of thosewelllogswhichwereaffectedbythegascapofthereservoirinthehydrocarbon-bearinginterval Correction of thosewelllogsfromgaseffectwhichwereinfluencedbythegascap Evaluation of reservoirengineeringcharasteristicsofthedifferentlithological/hydraulicunitsintheformofaveragecharasteristics and somecumulativereservoircharacteristics Evaluation of the air permeability of therocks Recommendationsforselectingthebestunitsforoil and gasproductionpurposes

  6. Reservoir Simulation Study on SamahField(Oil) Client: PlanningDepartment of WahaOilCompanyLibya,  Tripoli, 2006 – 2008Partner: Petroleum Research Centre of Libya, Tripoli Project Description: The quantititvewell log analysisis a part of a project composed of sevenwellsselectedfromthreehydrocarbon-bearingreservoirs. Quantitativeevaluation of themineral and lithologicalcomposition of therockspossiblybyprobalisticmethodology Evaluation of the air permeability of therocks Splittingtheeffectiveporosityintomacro-effective and micro-effectivecomponents Detection of thedepthofoil-watercontact(OWC) Tosplittheoilsaturationintomovable- and residual-oilsaturationcomponents Recommendationsforselectingthehydraulicunitsabove OWC, and, theintervalsforthebestoilproduction

  7. Reservoir Simulation Study on BalatField(Oil) Client: Planning Department of Waha Oil Company Libya,Tripoli, 2006 – 2008Partner: Petroleum Research Centre of Libya, Tripoli Project Description:The quantititvewell log analysisis a part of a project composed of sevenwellsselectedfromthreehydrocarbon-bearingreservoirs. Quantitativeevaluation of themineral and lithologicalcomposition of therockspossiblybyprobalisticmethodology Evaluation of the air permeability of therocks Splittingtheeffectiveporosityintomacro-effective and micro-effectivecomponents Detection of thedepthofoil-watercontact(OWC) Tosplittheoilsaturationintomovable- and residual-oilsaturationcomponents Recommendationsforselectingthehydraulicunitsabove OWC, and, theintervalsforthebestoilproduction

  8. Maintenance and repair of 60laboratory instruments for 4 laboratories Client: Petroleum Research Centre of Libya,  Tripoli, 2008 Project Description: Withinthe project Er-Petrooverhauled and repaired 60 laboratoryequipmentforthePetroleum Research Centre of Libya. EnvironmentLaboratory Instruments overhaul and maintenanceworks FuelLaboratory Instruments overhaul and maintenanceworks PetrophysicsLaboratory Instruments overhaul and maintenanceworks PVT LaboratoryEquipmentoverhaul and maintenanceworks

  9. Developement of a new Quantitative log-interpretation software called: Flex-In-Log Client: Petroleum Research Centre of Libya,  Tripoli, 2008 Project Description: Withinthe project Er-Petrooverhauled and repaired 60 laboratoryequipmentforthePetroleum Research Centre of Libya. EnvironmentLaboratory Instruments overhaul and maintenanceworks FuelLaboratory Instruments overhaul and maintenanceworks PetrophysicsLaboratory Instruments overhaul and maintenanceworks PVT LaboratoryEquipmentoverhaul and maintenanceworks

  10. Editorial, Printing and Publishing of JabalUwaynat and JabalSa’dahmap sheets Client: Industrial Researh Centre of Libya, Tripoli, 2009 Project Description: Withintheframework of the project the map sheets of JabalUwaynat (NF35-9) and JabalSa’dah (NG35-13) had beendigitalized, edited, gatheredalltheinformation and created a GeologicalInformation System fromthatarea, and connectingtotheexistingsystem.

  11. Geologial Mapping inJabalUwaynut Client: Industrial Researh Centre of Libya, Tripoli, 2008 – 2014Partner: Industrial Researh Centre of Libya Project Description: Er-Petro participated three mapping projects under Technical and Scientific cooperation with the Industrial Researh Centre of Libya. One of thesewasHaruj Al Abyadarea. GeologicalFieldMapping SampleAnalysis Preparing of 12 map sheetsfromthearea ApplyingdatatotheGeologicalInformation System

  12. JointGeologial Mapping inKufrahBasin Client: Industrial Researh Centre of Libya, Tripoli, 2008 – 2014 Partner: Industrial Researh Centre of Libya Project Description: Er-Petro participated three mapping projects under Technical and Scientific cooperation with the Industrial Researh Centre of Libya. One of thesewasHaruj Al Abyadarea. GeologicalFieldMapping SampleAnalysis Preparing of 12 map sheetsfromthearea ApplyingdatatotheGeologicalInformation System

  13. Industrial Projects

  14. Conventionalrefurbishment of TubeHeatExchangers Client: ÖMV - Burghausen, Germany, 1994 Partner: ERMO IndistrienmontagenReuner GmbH, Mainhausen, Germany Project Description:Within the project, vertical tube heat exchangers were refurbished.The followingworkswereincluded: De-pressurizing of the unit Mechanicalcleaningfromoutside Openingtheheatexchangermanhole Removingthetubebundle Highpressurecleaning, removal of sludge Changing of Gaskets Re-installation and pressuretests -Corrosionprotection -Commissioning -QualityControl

  15. Repair and Servicing of CoilTubeHeatExchangers Client: Shell DeutschlandOil GmbH - Godorf, Germany, 1995 - 1998 Partner: ERMO IndistrienmontagenReuner GmbH, Mainhausen, Germany Project Description:Within the project a total of coil tube heat exchangers were refurbished. The followingworkswereincluded: De-pressurizing of the unit Mechanicalcleaningfromoutside Openingtheheatexchangermanhole Removingthecoiltube Highpressurecleaning, removal of sludge Changing of gaskets Re-installation and pressuretests -Corrosionprotection -Commissioning -QualityControl

  16. General Maintenance of HeatExchangers Client: British Petrol - Lingen, Germany, 1994 - 2002 Partner: ERMO IndistrienmontagenReuner GmbH, Mainhausen, Germany Project Description:Within the project our company delivered the expertise to the facility. Wedonerepairing, overhauling of thefollowingindustrialinstruments:- HeatExchangers- CrackingTowers- HeatingTowers, Air HeatingDevices- ChangingtheGaskets- Repairtheseinstruments on-line and off-line- Pressure-tests- Scaffolding Works- SpecialisedWeldingWorksUnder 8 succesfulyearsweheldthegeneralmaintenance of differenttype and usage of heatexchangersand otherinstruments.

  17. Chemical Works Client: DOW Produktions GmbH & Co. Chemicals - Stade, Germany,1998 Partner: ERMO IndistrienmontagenReuner GmbH, Mainhausen, Germany Project Description: Within the project many vessels and boilers cleaned and refurbished The material used was stainless steel AISI 316L, to be installed in to an existing carbon-steel piping network. The pipingincludedweldedjoints, welding of elbows, asbuiltdesignes, pressure test and commissioning.

  18. Installing Underground NaturalGas Storage Line Client: BEB – Großenkeneten, Germany, 2001 - 2003 Partner: ERMO IndistrienmontagenReuner GmbH, Mainhausen, Germany Project Description:Within the project a total of 8650 m of technological pipe was constructed, underground. AftertheinstallationthefollowingservicesheldbyEr-Petro:- Pressure Testing - SettingupCathodicProtectionThe materialusedwasstainlesssteel AISI 316L, to be installedinto an existingcarbon-steelpipingnetwork. The pipingincludedweldedjoints, welding of elbows, asbuiltdesignes, pressure test and commissioning.

  19. RefurbishmentHeatExchanger and Piping Works Client: DEA MineralölwerkRaffinerie – Wesseling, Germany, 2001 Partner:ERMO IndistrienmontagenReuner GmbH, Mainhausen, Germany Project Description:Er-Petro held the general maintenanceof tube coil heat exchangers along with other piping works related to this factory. Withinthe project technologicalpipelineswasinstalled, repaired, overhauled and carried out for testing.The materialusedstainlesssteel AISI 316L, to be installedinto an existingcarbon-steelpipingnetwork. The pipingincludedweldedjoints, welding of elbows, asbuiltdesignes, pressure test and commissioning.

  20. InstallingCrackingTowers Client: MIRO -MineralölRaffinerieOberrhein GmbH & Co. Kg – Karlsruhe, Germany, 2001 Partner:ERMO IndistrienmontagenReuner GmbH, Mainhausen, Germany Project Description:Within the framework of the project, Er-Petro carried out installation of 5 Cracking Towers and 3 Heating Towers.These works included:-Quality Control-Pressure Tests-On-Line TestingBoth the customer and supplier were statisfied after the projects.The works was carried out by European Standars. (ISO,DIN,EUR)

  21. General Maintenance of HeatExchangers Client: ErdölRaffinerieEmsland – Lingen, Germany, 2001 Partner: ERMO IndistrienmontagenReuner GmbH, Mainhausen, Germany Project Description:Er-Petroheldthegeneralmaintenance of heatexchangersinthefacility. Itincluded:- Both On-line and Off-linecleaning- Refurbishment of heatexchangers- Changinggaskets- Pressure test - Overhaulingthesteelstructure- SpecialisedWeldingworks

  22. Maintenance of HeatExchangers Client: MIDER – Leuna, Germany, 2002 Partner:ERMO IndistrienmontagenReuner GmbH, Mainhausen, Germany Project Description:Er-Petroheldthegeneralmaintenance of heatexchangersinthefacility. Itincluded:- Both On-line and Off-linecleaning- Refurbishment of heatexchangers- Changinggaskets- Pressure test - Overhaulingthesteelstructure- SpecialisedWeldingworks

  23. Chemical and Petro-Chemical Works Client: British PetrolSchmierstoff – Hamburg, Germany, 2002 Partner:ERMO IndistrienmontagenReuner GmbH, Mainhausen, Germany Project Description:Withintheframework of theprojects, Er-Petrodonepiping and chemicalpipingworks.The major cause of the project, wasoverhaulingsome of thefactory’sVessels, Boilers and Piping System.

  24. TechnologicalPiping Works Client: ErdölRaffinerieEmsland – Lingen, Germany, 2002 Partner:ERMO IndistrienmontagenReuner GmbH, Mainhausen, Germany Project Description:Er-Petro constructed around 5000m of technological pipeline. After theinstallation, pressure and gasket tests carried out.Specializedweldingtechnologywasinspectedafterthe project.

  25. Maintenance of HeatExchangers Client: British Petrol – Gelsenkirchen, Germany 2002 Partner:ERMO IndistrienmontagenReuner GmbH, Mainhausen, Germany Project Description:Er-Petro held the general maintenance of heat exchangers in the facility. Itincluded:- Both On-line and Off-linecleaning- Refurbishment of heatexchangers- Changinggaskets- Pressure test - Overhaulingthesteelstructure- SpecialisedWeldingworks

  26. Main PumpMaintenance and RelatedPiping Works Client: BEB – Großenkneten, Germany, 2003 Partner:ERMO IndistrienmontagenReuner GmbH, Mainhausen, Germany Project Description:Within the project, we held the maintenanceand overhauling works, such as: physical damages, gaskets and major piping works.Alltheseworksrelatedtothe main pump of a steamturbine. ( part of thecondensesystem )

  27. Refurbishment of HeatExchangers Client: Holborn – Hamburg, Germany, 2003 Partner: ERMO IndistrienmontagenReuner GmbH, Mainhausen, Germany Project Description:At 2003 in Hamburg, Er-Petro refurbished a complete set of heat exchangers at the Oil Refinery in Holborn. Withinthesixmonthcontract, Er-Petrorefurbished more thanhundredpcs. Of industrialtube,bundle and vesseltype of heatexchangers.After the working phase, gasket and pressure test carried out by a third party, and both of the customer and the –megrendelő- complete sattisfaction.

  28. General Maintenance and Refurbishment of TubeHeatExchangers Client: DEA Mineralölwerk – Wesseling, Germany 2004 Partner: ERMO IndistrienmontagenReuner GmbH, Mainhausen, Germany Project Description:Within the project our company held the turn-around maintenance in the facility.The following works were included: De-pressurizing of the heat exchanger units Mechanical cleaning from outside, inside High pressure cleaning, removal of sludge Changing of gaskets Re-installation and pressuretests -Corrosionprotection -Commissioning -QualityControl

  29. Repairing of Coil Tube Heat Exchangers Client: Ruhr Oel GmbH – Gelsenkirchen, Germany 2004 Partner:ERMO IndistrienmontagenReuner GmbH, Mainhausen, Germany Project Description:Within the project a total of 39 pcs of vertical coil tube heat exchangers were repaired.The following works were included: De-pressurizing of the unit Mechanicalcleaningfromoutside Openingtheheatexchangermanhole Removingthecoiltube Highpressurecleaning, removal of sludge Changing of gaskets Re-installation and pressuretests -Corrosionprotection -Commissioning -QualityControl

  30. VesselMaintenance and Piping Works Client: Erdgas und Erdöl GmbH – Großenkneten, Germany, 2004 Partner:ERMO IndistrienmontagenReuner GmbH, Mainhausen, Germany Project Description:Within the project a total of 39 pcs of vertical coil tube heat exchangers were refurbished.The following works were included: De-pressurizing of the unit Mechanicalcleaningfromoutside Openingtheheatexchangermanhole Removingthecoiltube Highpressurecleaning, removal of sludge Changing of gaskets Re-installation and pressuretests -Corrosionprotection -Commissioning -QualityControl

  31. Repair and Servicing of TubeHeatExchangers Client: Shell DeutschlandOil GmbH RheinlandRaffinerie-Wesseling, Germany, 2006 Partner: ERMO IndistrienmontagenReuner GmbH, Mainhausen, Germany Project Description:Within the project a total of 39 pcs of vertical coil tube heat exchangers were refurbished.The following works were included: De-pressurizing of the unit Mechanicalcleaningfromoutside Openingtheheatexchangermanhole Removingthecoiltube Highpressurecleaning, removal of sludge Changing of gaskets Re-installation and pressuretests -Corrosionprotection -Commissioning -QualityControl

  32. Repair and servicing of HeatExchangers Client: MIRO(MineralölRaffinerieOberrhein GmbH & Co. Kg) – Karlsruhe, Germany 2007 Partner: ERMO IndistrienmontagenReuner GmbH, Mainhausen, Germany Project Description:Within the project a total of 39 pcs of vertical coil tube heat exchangers were refurbished.The following works were included: De-pressurizing of the unit Mechanicalcleaningfromoutside Openingtheheatexchangermanhole Removingthecoiltube Highpressurecleaning, removal of sludge Changing of gaskets Re-installation and pressuretests -Corrosionprotection -Commissioning -QualityControl

  33. Piping, Cladding and Maintenance Works Client: Exxon Mobil – Rotterdam, Netherlands, 2007 Partner: ERMO IndistrienmontagenReuner GmbH, Mainhausen, Germany Project Description:Within the project horizontal, vertical,coil tube, bundle heat exchangers were repaired (physical damages,gaskets,leakage). Along with other piping works related to the heat exchangers, and cladding works.The following works were included: De-pressurizing of the unit Mechanicalcleaningfromoutside Openingtheheatexchangermanhole Removingthecoiltube Highpressurecleaning, removal of sludge Changing of gaskets Re-installation and pressuretests -Corrosionprotection -Commissioning -QualityControl

  34. Heat Exchanger Refurbishment and Repair Client: Ruhr Oel GmbH – Gelsenkirchen – 2007 Partner: ERMO IndistrienmontagenReuner GmbH, Mainhausen, Germany Project Description:Within the project a total of 39 pcs of vertical coil tube heat exchangers were repaired and refurbished.The following works were included: De-pressurizing of the unit Mechanicalcleaningfromoutside Openingtheheatexchangermanhole Removingthecoiltube Highpressurecleaning, removal of sludge Changing of gaskets Re-installation and pressuretests -Corrosionprotection -Commissioning -QualityControl

  35. Heat Exchanger Refurbishment and Repair Client: WackerChemie – Burghausen - 2007 Partner: ERMO Indistrienmontagen Reuner GmbH, Mainhausen, Germany Project Description:Within the project a total of 42 pcs of vertical coil tube heat exchangers were overhauled.The following works were included: De-pressurizing of the unit Mechanicalcleaningfromoutside Openingtheheatexchangermanhole Removingthecoiltube Highpressurecleaning, removal of sludge Changing of gaskets Re-installation and pressuretests -Corrosionprotection -Commissioning -QualityControl

  36. General Maintenance of Heat Exchangers Client: Shell DeutschlandOil GmbH & Co. – Hamburg, Germany – 2008 Partner: ERMO IndistrienmontagenReuner GmbH, Mainhausen, Germany Project Description:Within the project our company participated the yearly one month maintenance of the facility, specialised for the maintenance of heat exchangers.The following works were included: De-pressurizing of the unit Mechanicalcleaningfromoutside Openingtheheatexchangermanhole Removingthecoiltube Highpressurecleaning, removal of sludge Changing of gaskets Re-installation and pressuretests -Corrosionprotection -Commissioning -QualityControl

  37. On-line Cleaning of Heat Exchangers Client: British Petrol – Großenkneten, Germany, 2008 Partner: ERMO IndistrienmontagenReuner GmbH, Mainhausen, Germany Project Description:Within the project a total of 20pcs of vertical coil tube heat exchangers were cleaned.The following works were included: De-pressurizing of the unit Mechanicalcleaningfromoutside Openingtheheatexchangermanhole Removingthecoiltube Highpressurecleaning, removal of sludge Changing of gaskets Re-installation and pressuretests

  38. General Maintenance of High-Pressure Heat Exchangers Client: British Petrol – Ölwerk, Germany, 2008 Partner: ERMO IndistrienmontagenReuner GmbH, Mainhausen, Germany Project Description:Within the project different type of heat exchangers were refurbished, cleaned, repaired.The following works were included: De-pressurizing of the unit Mechanicalcleaningfromoutside Openingtheheatexchangermanhole Removingthecoiltube Highpressurecleaning, removal of sludge Changing of gaskets Re-installation and pressuretests -Corrosionprotection -Commissioning -QualityControl

  39. Refurbishment of High-Pressure Heat Exchanger Client: Shell RheinlandDeutschland GmbH & Co. – Wesseling, Germany, 2009 Partner: ERMO IndistrienmontagenReuner GmbH, Mainhausen, Germany Project Description:Within the project a total of 20pcs of vertical coil tube heat exchangers were refurbished.The following works were included: De-pressurizing of the unit Mechanicalcleaningfromoutside Openingtheheatexchangermanhole Removingthecoiltube Highpressurecleaning, removal of sludge Changing of gaskets Re-installation and pressuretests -Corrosionprotection -Commissioning -QualityControl

  40. Refurbishing and Cleaning of Low-Pressure Heat Exchanger Client: Shell Hamburg Deutschland GmbH & Co. – Hamburg, Germany, 2010 Partner: FMZ Engineering GmbH Project Description:Within the project a total of 40 pcs of vertical,horizontal coil tube heat exchangers were refurbished.The following works were included: De-pressurizing of the unit Mechanicalcleaningfromoutside Openingtheheatexchangermanhole Removingthecoiltube Highpressurecleaning, removal of sludge Changing of gaskets Re-installation and pressuretests -Corrosionprotection -Commissioning -Quality Control

  41. Maintenance of Heat Exchangers Client: British Petrol – Gelsenkirchen, Germany, 2010 Partner: FMZ Engineering GmbH Project Description:Within the project a total of 24 pcs of vertical coil tube heat exchangers were refurbished.The following works were included: De-pressurizing of the unit Mechanicalcleaningfromoutside Openingtheheatexchangermanhole Removingthecoiltube Highpressurecleaning, removal of sludge Changing of gaskets Re-installation and pressuretests -Corrosionprotection -Commissioning -QualityControl

  42. Manufacturing and Hihg-Pressure Heat Exchanger Client: Shell Hamburg Deutschland GmbH & Co. – Hamburg, Germany, 2010 Partner: FMZ Engineering GmbH Project Description:Within the project a total of 30 pcs of tube heat exchangers were manufactured. After the manufacturing, the heat exchangers were placed on-line. Within the manufacturing process The following works were included: De-pressurizing of the unit Mechanicalcleaningfromoutside Openingtheheatexchangermanhole Removingthecoiltube Highpressurecleaning, removal of sludge Changing of gaskets Re-installation and pressuretests -Corrosionprotection -Commissioning -QualityControl

  43. Heat Exchanger Pipenetwork Construction Client: DOW Chemicals – Wesseling, Germany, 2011 Partner: FMZ Engineering GmbH Project Description:Within the project, our company participated in manufacturing, and after the process, the installation of these pipilines within the factory.

  44. Cleaning of Heat Exchangers Client: MIRO (MineraloelraffinerieOberrhein) – Karlsruhe, Germany, 2012 Partner: FMZ Engineering GmbH Project Description:Within the project a total of 40 pcs of different type of heat exchangers cleaned.The following works were included: Mechanical cleaning from outside High pressure cleaning, removal of sludge Re-installation and pressure tests -Commissioning -QualityControl

  45. Refurbishment of Heat Exchangers Client: British PetrolRaffinerie – Gelsenkirchen, Germany, 2012 Partner: FMZ GmbH Project Description:Within the project a total of 50pcs of vertical coil tube heat exchangers were refurbished.The following works were included: De-pressurizing of the unit Mechanicalcleaningfromoutside Openingtheheatexchangermanhole Removingthecoiltube Highpressurecleaning, removal of sludge Changing of gaskets Re-installation and pressuretests -Corrosionprotection -Commissioning -QualityControl

  46. Cleaning Heat Exchanger Client: British PetrolLyondellBasellRaffinerie – Rotterdam, Netherlands, 2013 Partner: FMZ GmbH Project Description:Within the project all of the condensate system’s (around 40 pcs) of various type of heat exchangers were refurbished.The following works were included: De-pressurizing of the unit Mechanicalcleaningfromoutside Openingtheheatexchangermanhole Removingthecoiltube Highpressurecleaning, removal of sludge Changing of gaskets Re-installation and pressuretests -Corrosionprotection -Commissioning -QualityControl

  47. Maintenance of Heat Exchangers Client: DOW Chemicals – Wesseling, Germany, 2011 Partner: FMZ Engineering GmbH Project Description:Within the project a total of 27pcs of vertical, coil tube, horizontal coil tube, vessels, boilers along with heat exchangers were refurbishments.The following works were included: De-pressurizing of the unit Mechanicalcleaningfromoutside Openingtheheatexchangermanhole Removingthecoiltube Highpressurecleaning, removal of sludge Changing of gaskets Re-installation and pressuretests -Corrosionprotection -Commissioning -QualityControl

  48. Overhaul, Repairing of High Pressure Heat Exchangers Client: DEA MethanolPlant and Raffinerie – Wesseling, Germany, 2013 Partner: FMZ GmbH Project Description: Within the project some pcs of vessel and coil bundle heat exchangers were refurbished.The following works were included: De-pressurizing of the unit Mechanicalcleaningfromoutside Openingtheheatexchangermanhole Removingthecoiltube Highpressurecleaning, removal of sludge Changing of gaskets Re-installation and pressuretests -Corrosionprotection -Commissioning -QualityControl

  49. Refurbishment of Heat Exchangers Client: DEA MineralölwerkRaffinerie – Wesseling, Germany, 2013 Partner: FMZ GmbH Project Description: Within the project a total of 46 pcs of vertical coil tube heat exchangers were refurbished.The following works were included: De-pressurizing of the unit Mechanicalcleaningfromoutside Openingtheheatexchangermanhole Removingthecoiltube Highpressurecleaning, removal of sludge Changing of gaskets Re-installation and pressuretests -Corrosionprotection -Commissioning -QualityControl

  50. Overhauling Heat Exchangers Client: TOTAL RaffinerieMitteldeutschland – Leuna, Germany, 2014 Partner: FMZ GmbH Project Description: Within the project a total of 38 pcs of vertical coil tube heat exchangers were overhauled.The following works were included: De-pressurizing of the unit Mechanicalcleaningfromoutside Openingtheheatexchangermanhole Removingthecoiltube Highpressurecleaning, removal of sludge Changing of gaskets Re-installation and pressuretests -Related Piping Works -Commissioning -Re-painting