1 / 32

OCS Project

OCS Project. National Chiao Tung University (NCTU). Outline. 1 ) Motivation 1.1) Schedule progress 1.2) Project members 2) Current progress 2.1) 日本資費方案分析 2.2) 新加坡資費方案分析 2.3) 香港資費方案分析 3) Open source Diameter solution. Motivation. Objective

chaela
Download Presentation

OCS Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OCS Project National Chiao Tung University (NCTU) National Chiao Tung University

  2. Outline • 1) Motivation • 1.1) Schedule progress • 1.2) Project members • 2) Current progress • 2.1) 日本資費方案分析 • 2.2) 新加坡資費方案分析 • 2.3) 香港資費方案分析 • 3) Open source Diameter solution National Chiao Tung University

  3. Motivation • Objective • Research & Design of interface and interoperation between Policy and Online Charging system • Abstract • 本研究案將結合交大相關領域之研究經驗與中華電信研究院帳務所長期研發OCS經驗,共同整理出國外各大電信業者的相關資費方案並將其分類出幾種資費類型,並根據此資費類型研究其運作的Message Flow。 • 依循目前的3GPP Release 11規格,本計畫也將針對OCS中重要的傳輸介面Rc進行設計,以利後續研究之應用。研究成果亦可做為研發與部署新一代計費系統之重要依據。 National Chiao Tung University

  4. Schedule progress • 20130301 -本合作案初次雙邊會議 • 20130313 - 交大招開校內會議 • 20130403 -初次前往中華開會 • 20130409 ~ NOW • 隔週一次舉行regular meeting • 研讀並報告OCS相關Paper、報告書、規格書…etc • 20130503 ~NOW • 開始進行第一階段亞洲地區的資費調查 • 20130524 - 第二次雙邊會議與進度報告 • 20130611~20130822 - 計畫書討論與修訂 • 20130906- 2013 4G LTE Workshop • 成功大學蘇淑茵教授演講3GPP Charging and Its Application with Diameter Protocol • 20130925~20131014- 邀請國外diameter專家進行訓練課程 National Chiao Tung University

  5. Schedule progress • 期中報告 • 擬結合學校以及中華電信研究院帳務所成員,共同整理出國外各大公司的相關資費方案,將其分析提出至少三種以上可行的OCS資費類型,並根據整理或提供的資費類型共同整理出其運作的Message Flow,於期中審查會議中報告及通過審查。 • 目標國家 • 從亞洲國家著手,挑選各國各三間具代表性的電信公司作為比較對象,並逐步推進調查至五大洲的著名電信公司。 • 調查方向 National Chiao Tung University

  6. Schedule progress • 期中報告 (Continue.) • Message Flow • 將依照先前調查各國資費類型後所整理出的商業模式來進行,可先簡單分類為基本方案、吃到飽方案以及平板方案。 • 根據3GPP Spec,將會有關係到下列模組,而本計畫的重點則以紅色表示。 OCS Rc ABMF Session Based Charging Function Sy PCRF Event Based Charging Function National Chiao Tung University

  7. Schedule progress • 期末報告 • 於期末審查會議中報告及通過審查,以期中報告所整理之message flow為主,實作其中適用於OCS系統之Rc介面流程並Demo。技術報告通過中華電信研究院帳務所審查,專利通過中華電信研究院帳務所審查並於中華民國完成專利申請。 • 預計將利用OpenSource的freeDiameter進行Rc介面開發,系統本身將建構在Linux Ubuntu或是Unix FreeBSD之上,並透過Client、Server端架構進行messageflow之模擬。 (詳情請見本投影片第三部分Open source Diameter solution) National Chiao Tung University

  8. Project members NCTU OCS Team 整體計畫監控、方法設計 協同整體計畫監控、方法設計 林甫俊教授 曾煜棋教授 王筱維 吳若妌 黃懷陞 蘇子仲 蔡萬都 全IP網路PCC系統資料研讀,即時計費額度控制與策略分析,撰寫書面報告及系統設計,系統介面開發 National Chiao Tung University

  9. Outline • 1) Project members • 2) Current progress • 2.1) 日本資費方案分析 • 2.2) 新加坡資費方案分析 • 2.3) 香港資費方案分析 • 3) Open source Diameter solution National Chiao Tung University

  10. Current Progress 亞洲地區資費方案分析 Sy interface實作 計畫書撰寫 日本資料分析 新加坡資料分析 香港資料分析 National Chiao Tung University

  11. Outline • 1) Project members • 2) Current progress • 2.1) 日本資費方案分析 • 2.2) 新加坡資費方案分析 • 2.3) 香港資費方案分析 • 3) Open source Diameter solution National Chiao Tung University

  12. 三大電信業者 - 4G資訊比較 資料來源:官網 National Chiao Tung University

  13. 三大電信業者 - 4G覆蓋率 KDDI NTTdocomo SoftBank 資料來源:http://opensignal.com/coverage-maps/Japan/ National Chiao Tung University

  14. 三大電信業者 - 市占率 資料來源:https://sites.google.com/site/mobilemarketshare/home National Chiao Tung University

  15. 4G方案比較 三間公司4G網路費用都比3G費用便宜,推測是因為推廣4G網路的關係。 1KB≒8packet S!網路基本使用費NT$93.97 資料來源:官網 National Chiao Tung University

  16. 4G網路吃到飽方案比較 超過上限切換為128Kbps(取消則每2G收取$783.06) 資料來源:官網 National Chiao Tung University 16

  17. Outline • 1) Project members • 2) Current progress • 2.1) 日本資費方案分析 • 2.2) 新加坡資費方案分析 • 2.3) 香港資費方案分析 • 3) Open source Diameter solution National Chiao Tung University

  18. 三大電信業者 -4G資訊比較 National Chiao Tung University

  19. 三大電信業者 - 4G覆蓋率 *StarHub should reach 100% coverage before 2014 National Chiao Tung University

  20. 三大電信業者 - 市占率 20% 42% 38% 統計時間:(~2013.04) National Chiao Tung University

  21. 4G方案比較 * For 4G LTE ** For re-contracting customers SGD 1:23.82 NTD National Chiao Tung University

  22. 4G數據吃到飽方案 ** For re-contracting customers SGD 1:23.82 NTD National Chiao Tung University

  23. Outline • 1) Project members • 2) Current progress • 2.1) 日本資費方案分析 • 2.2) 新加坡資費方案分析 • 2.3) 香港資費方案分析 • 3) Open source Diameter solution National Chiao Tung University

  24. 香港電信業者 - 4G資訊比較 p.s. 2013-03-19 報導 National Chiao Tung University

  25. 三大電信業者 - 市占率 • 2013/7/16 香港明報報導 Hutchison 3 China-mobile Smartone National Chiao Tung University

  26. 三大電信業者- 4G覆蓋率 National Chiao Tung University

  27. 4G方案比較 - 表示沒有限制 p.s通話量欄位為網內+網外 National Chiao Tung University

  28. 4G數據吃到飽方案 National Chiao Tung University

  29. Outline • 1) Project members • 2) Current progress • 2.1) 日本資費方案分析 • 2.2) 新加坡資費方案分析 • 2.3) 香港資費方案分析 • 3) Open source Diameter solution National Chiao Tung University

  30. Solutions for Implementation What’s tool can be used for implementation of Rc interface? • freeDiameter (C language) • Flexible for implementations • Maintaining recently • Highly scalable and high performance environment • Mobicents Diameter (Java language) • Convenient java-based library • Less online support than freeDiameter • Open Diameter (C++ language) • Hasn’t been updated for many years National Chiao Tung University

  31. freeDiameter • Open-source and released under a BSD compatible • Written in C (POSIX) for excellent performance and small memory footprint • Structure • A daemon for the Diameter Base Protocol (defined in RFC 3588, ​RFC 3588bis and RFC 6733)support • Extensions modules for advanced functionalities Diameter Extensions (Ro, Rf, Rc, etc.) Diameter Base Protocol SCTP/TCP IP National Chiao Tung University

  32. Three Phases • Phase 1: Implementation of Rc interface • Phase 2: Implementation of the scenarioswith the researched business models • Phase 3: Implementation of Virtual Machines (VMs) for demo National Chiao Tung University

More Related