1 / 2

Engineering Help Needed Cell 280

Engineering Help Needed Cell 280. Activities Bring the following frames into adjustment : 1618, 1670, 1695, 1719, 1769, 1794, 1815, 1836, 1857 Frame contours and twist do not allow attach fittings to align with follow on Assemblies (Floor Grid, WWTR Rails, Side Guide Rails, Blower Assy)

chaka
Download Presentation

Engineering Help Needed Cell 280

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Engineering Help Needed Cell 280 • Activities • Bring the following frames into adjustment: 1618, 1670, 1695, 1719, 1769, 1794, 1815, 1836, 1857 • Frame contours and twist do not allow attach fittings to align with follow on Assemblies (Floor Grid, WWTR Rails, Side Guide Rails, Blower Assy) • Agreed during rate summit (6 mos ago) this was an issue • Cost ($250k) and lead time (8 -10 weeks) prohibitive • ELR’s: • ELR 073916 to open Tol Margins on 1st 4 STA is biggest help (approx 40%) • ELR 076865 at STA 1769, 1815 and 1836 Next biggest help (approx 25%) • Summary • Frames 1795,1769 and 1836 account for the largest factor in –M Fittings, we need them to be aligned to the OPB, and follow on assemblies (no twists) • OR • ELRS 073916 and 076865 must be worked, executed and come through CIB in less than 20 ships for Floor grid installation to meet rate.

  2. Engineering Help Needed Cell 275 • Activities • Section 47 Floor Grid Intercostals Class III Holes. • Incorporate improved datum and tolerance structure for floor grid assy. • Increase MBD shim allowance between floor beam and frame fittings at STA 1618, 1644, 1670 and 1695. • ELR’s: • ELR 073916 Angularity Tool. • ELR 072169 – Floor Grid Instl • ELR 072438 – Floor Grid Assy • ELR 073916 – Floor Grid Assy • Summary • Floor beams are being installed at an angle that has the potential to be outside of engineering requirements. Ensure angularity requirements of Floor Beams are met to provide a stable build for the Floor Grid Assembly. • Locating floor grid properly per requirements to facilitate successful FA&D join results in excessive gaps between floor beam and frame fittings. • Current Floor Grid Assy tolerances fail to produce a product that will comply with end item requirements during installation.

More Related